Post a question or comment
Credit Filters
Water Use Reduction—20% Reduction
Filter by location
Forum
Topic
Replies
Recent

Commercial kitchen handwashing

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jatuwat Varodompun  on 

In a restaurant, we have a foot padel hand washing for food preparation of restaurant staffs. Does it require to include this equipment in the calculation by using baseline of 0.5 gpm?

1
Fri Jul 18, 2014, 3:06 am

Aerator pantry sink

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  H. Group  on 

We are using the Kohler faucet with 1.5 gpm aerator for pantry sink, I asked the supplier for .5gpm aerator, he said lowest Kohler offers on this faucet is 1.5 gpm.

1
Wed Dec 30, 2015, 5:36 pm
1
Wed Nov 3, 2010, 3:05 am

Dual Faucets on Single Fixture

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Rick Servoss  on 

A pantry sink is being provided with a dual faucet fixture. One faucet is for pantry type applications, the other is a filtered faucet meant for human consumption.

1
Sat Nov 19, 2011, 3:28 am

Toilets not within the tenant space

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Mike D  on 

For WE Prerequisite 1 and WE credit 1, should toilets that are not within the tenant space be included in the calculations? If not, how do we complete the online form as it marks incomplete when th

1
Mon Nov 4, 2013, 4:48 pm

Combination Shower/Bathtub in Dormitory

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vicki Rybl  on 

Hi All, I am working on a project which is a dormitory. Each living unit has a bathroom which, along with a toilet and sink, contains a combination shower/bathtub.

1
Thu Aug 25, 2016, 3:42 pm

How to classify Hotel FTE's

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Matt Wolfe  on 

For Hotel project types, has anyone recently classified hotel guests as residents within the WEc1 plumbing template ? I understand the distinction between treating the guests as an FTE vs.

1
Thu May 26, 2011, 9:56 pm

Private Lav Faucets - Baseline vs. Metered Design

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vincent Pieri  on 

We are working on a single floor, single tenant project with several fixture group assignments.

1
Wed Sep 5, 2012, 10:46 pm

Toilet Scope

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  sompoche sirichote  on 

If our client who own the entire building would like to do the fitout for only 1 floor.

1
Thu Sep 13, 2012, 1:46 pm

Retail Customer

posted by  Simon Sue  on 
1
Fri Aug 20, 2010, 5:18 am