Forum quick links
Aerators on Kitchen Faucets
CI-2009 WEc1:Water Use Reductionposted by Katherine Ann Resurreccion on
Hi Our project's base building kitchen faucet has a 1.1gpm flow rate but would need to be upgraded to a 0.5gpm to reach our target effeciency.
How to calculated for hybrid urinals
CI-2009 WEc1:Water Use Reductionposted by Susan Di Giulio on
Sloan has a new "hybrid" urinal that is basically waterless but does a pre-programmed, 1 gallon system flush every 72 hours. This solves a lot of maintenance and odor problems.
Base building fixtures meet old LEED 2.0, but not LEED CI 2009
CI-2009 WEc1:Water Use Reductionposted by Sandra Eremic on
Our project occupies (4) out of (10) floors of a building which was LEED 2.0 certified. We are attempting Silver under LEED CI 2009.
Toilets not within the tenant space
CI-2009 WEc1:Water Use Reductionposted by Mike D on
For WE Prerequisite 1 and WE credit 1, should toilets that are not within the tenant space be included in the calculations? If not, how do we complete the online form as it marks incomplete when th
WATER USE REDUCTION
CI-2009 WEc1:Water Use Reductionposted by sajeev john on
DOES THE COMMON TOILEST IN A FLOOR COME UNDER TENANT SCOPE? ENTIRE FLOOR IS OCUPIED BY SAME COMPANY? FLOOR IS MEANT TO BE RENT TO DIFFERENT TENANATS AND OUR COMPANY IS OCCUPYING THE ENTIRE FLOOR?
Existing Blow-out toilets
CI-2009 WEc1:Water Use Reductionposted by Russell Philstrom on
Our project is in a 57-story building where the existing toilets are original to the building (1972) and are blow-out toilets at 3.5gpf.
LEED Retail CI customer and FTE calculations
CI-2009 WEc1:Water Use Reductionposted by Jeanne Varney on
For LEED Retail CI, to calculate the WEc1 water reduction you have to input the number of FTE's as well as customers.
WEc1: Only one fixture in CI Space
CI-2009 WEc1:Water Use Reductionposted by Susan Di Giulio on
Dear Tristan, If you only have one fixture, a faucet in staff lunchroom, in a CI project, and it does meet the goal of 20% better than code, i.e. 1.5 gpm. Then do you gain this credit?
WEc1
CI-2009 WEc1:Water Use Reductionposted by Linda Delair on
As 1.6 is a standard low flow toilet, in order to further reduce water use is it better to specify a 1.28 gpf or a dual flush toilet? Thank you.
Scope of landlord change
CI-2009 WEc1:Water Use Reductionposted by Graham Langton on
Within our CI project (Office - 5 stories), there are landlord core areas including all toilets / washing facilities (same toilet block repeated on each floor).