How to document Squat Toilet/Hole Toilet?
CI-2009 WEc1:Water Use Reductionposted by Derek Fung on
Currently, I'm working on a CI project in China. The project locates on 19th floor, which shared by two tenants.
Commercial Kitchen hand washing sinks
CI-2009 WEc1:Water Use Reductionposted by ANDREW MOISEEV on
Are the hand wash sinks included in the 20% reduction requirement?
Same Fixtures Different Usage Groups
CI-2009 WEc1:Water Use Reductionposted by padraic o connell on
Hello, I have assigned two fixture usage groups within a building; A daycare usage group (12 FTE) and General Office usage group (140 FTE).
WEc1 - Lav Efficiency Floor?
CI-2009 WEc1:Water Use Reductionposted by Jeremy Knoll on
Is there a lower limit to the lav flow rate below 0.5gpm that USGBC will accept? I saw something posted on the EPA's website awhile back, but am not finding it now.
Dual toilet flush rate average
CI-2009 WEc1:Water Use Reductionposted by Mike D on
If we were to calculate the average flush rate of a dual flush toilet (with urinals present in the space) we use the example average flow rate equation provided by USGBC in their Appendix A water c
Where do plumbing fixture uses, by occupancy type, come from?
CI-2009 WEc1:Water Use Reductionposted by John ONeill on
Does anyone know what the basis is for the plumbing fixture uses by occupancy type? For example - 3 water closet uses for each female FTE, etc.
WEp1 & SSc3.2
CI-2009 WEc1:Water Use Reductionposted by Cathal Heneghan on
Hi If water fixtures are not part of the project scope and are not considered for the LEED submission, can the project still pursue SSc3.2 due to existing showers in the base building? I thought
Core Fixtures Existing, Tenant to Install Additional Fixtures
CI-2009 WEc1:Water Use Reductionposted by Nelina Loiselle on
I have a LEED-CI project in which there is one toilet that is EXISTING in the base building and NOT A PART OF THE SCOPE of the tenant improvement.
WE p1 CI and CS
CI-2009 WEc1:Water Use Reductionposted by Garrison Elder on
I am a little confused by what i have read concerning WEp1 and what fixtures are being used by a tenant vs what is in the scope. I have a CS poject where I will acheive 32% water savings.