Forum quick links
Energy Star equipment
CI-2009 EAp2:Minimum Energy Performanceposted by mingyu Zhang on
Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.
Building Over Hang
CI-2009 EAp2:Minimum Energy Performanceposted by Simon Sue on
We working on a commercial bank and calculating the installed LPD in the project space. The commercial bank has a overhang on the 1st floor and is included in our LEED boundary.
No Design Engineer
CI-2009 EAp2:Minimum Energy Performanceposted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on
Currently working on a project in which all HVAC mechanical systems were existing. Only the ductwork was installed.
ASHRAE 90.1 2007 Section 9.4.1 Automatic Lighting Shutoff
CI-2009 EAp2:Minimum Energy Performanceposted by Ashonta Langdon on
Hello! We're working on a TI office project of less than 5,000 sf in a building that is larger than 5,000 sf.
Brazilian equivalent standard
CI-2009 EAp2:Minimum Energy Performanceposted by Aline Luther on
I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.
Interactive Compliance Forms.
CI-2009 EAp2:Minimum Energy Performanceposted by elizabeth warlop on
If I am not altering the HVAC, Or Building Envelope, or Service Water, Do I have to fill out the Interactive Compliance Forms, ie the Building Envelope, the HVAC Compliance the Service Hot water.?
Owner installed lighitng
CI-2009 EAp2:Minimum Energy Performanceposted by Allen Cornett on
I am trying to find out if a building owner is installing new lighting in a space, will a future tenant be able to included the existing lighting in the lighting power density calculations for EAp2