Forum quick links
EA Prerequisite 2
CI-2009 EAp2:Minimum Energy Performanceposted by Poorva Keskar on
In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.
EAc1 required 2 points
CI-2009 EAp2:Minimum Energy Performanceposted by Jennifer Berthelot-Jelovic on
I know that for EAc1 there was a requirement that "All LEED for New Construction project registered after June 26, 2007 are required to achieve at least two (2) points." Since I am working on a LEE
Complicated HVAC situation in a CI 2009 project.
CI-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
We are working on a CI project which occupies portions of four floors in a University Medical Research Building.
VRV Units Prescriptive Compliance in LEED CI 2009
CI-2009 EAp2:Minimum Energy Performanceposted by Himanshu Dehra on
The project is installing VRV units of Daikin (VRV Model # RXYQ18PY16).
Energy Star equipment
CI-2009 EAp2:Minimum Energy Performanceposted by mingyu Zhang on
Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.
Building Over Hang
CI-2009 EAp2:Minimum Energy Performanceposted by Simon Sue on
We working on a commercial bank and calculating the installed LPD in the project space. The commercial bank has a overhang on the 1st floor and is included in our LEED boundary.
No Design Engineer
CI-2009 EAp2:Minimum Energy Performanceposted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on
Currently working on a project in which all HVAC mechanical systems were existing. Only the ductwork was installed.
Lighting load synergy in EAp2 and EAc1.2
CI-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?