CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Peter Doo on
If I have an Interior Lighting COMcheck completed for a project, is that sufficient enough for upload or do I still have to provide the Lighting Compliance Documentation Interactive Compliance Form
Gross Lighted Area - ASHRAE 90.1-2007
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Trevor Karstens on
This topic was previously posted under EAp2, but was not getting any responses; this seems like the more relevant location anyways: I'm encountering difficulty in documenting the minimum 10% light
Exterior lighting classification -
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Ricardo Sá on
Hi, I’m currently working on a LEED 2009-CI project applied to a hypermarket and I’m having doubts in classifying some surfaces according to table 9.4.5 of ASHRAE 90.1 2007 (“Lighting Power Densi
Square Footage for the Decorative Lighting Allowance
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Christopher Shaw on
When you claim a lighting allowance for Decorative appearance you get 1 watt/sf.
Exemption for Labs
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Amit Ahiel on
Let me preface my question with some context. I have a client (world famous for their electronic gadgets) who is building a lab for research and development of new gadgets and components.
Should LPD Area match with Gross Project Square Footage?
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Sunayana Jain on
I have a project in which my calculated area by space by space method is slightly more than the area inserted by LEED Admin in "Gross Project Square Footage". Should these numbers match?
Building Area vs Space-by-Space method
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Brian Coldwell on
We are working on a LEED-CI project in a large commercial office building, where the overall 'building area' method would clearly be office at 1 W/sf.
De-lamping
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Sunayana Jain on
Can de-lamping be acceptable to meet the Lighting Power Density Requirements?
T8 LED light specifications
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Mahbuba Khan AIA, LEED AP BD+C on
To achieve energy efficiency a project in Bangladesh is planning on buying T8 LED lights with following specifications.
LIVING GREEN WALL GROW LIGHTS EA CRDIT1.1
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Shane Tohara on
We are installing a living green wall in the lobby of our 2009 CI project. We need to install grow lights for proper plant health.