Zoning in Retail
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jan Hesse on
I am working on an CI for Retail project. The Retail space will be included in an shopping mall and is three floors high.
Energy Model Approach - Central Plant serving the Project Space
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Amal Venugopal on
Dear All,
CI-2009 EAc1.3, Motor Variable Speed Control
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by David Schaeffer on
I am working on a tenant build out where all the equipment is existing, as part of the recent core and shell build.
CI-2009 EAc1.3, Option 1 HVAC Efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Joseph Girgenti on
beginning design of a LEED 2009 CI project. Will be replacing AC units so want to spec units with efficiency adequate to meet this requirement. Requirement references NBI Advanced Build
Core Performance Guide Compliane
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Patrice McVeigh on
Hi All,
We have a CI project and have a query in relation to Core Performance Guide Criteria.
CI Office v2009 - Water Cooled Chiller in Base Case & DCP in Proposed Case
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by SSN Energy Model on
Hi All,
Greetings!
CI-2009 EA c1.3 Optimize Energy Performance HVAC
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jamal Anwar on
For Leed EA C1.3 calcs to comply with Core Perf Guide:
Chilled water flow and pipe sizes
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jayakumar Pamuri on
Hi All, I am here to post my query about chilled water system,flow and pipe sizes.
Option 1
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Azita Mousavi on
I'm working on an existing Building. the original building has its gold certificate CS and all main VAV roof top units are installed originally at 2008.