Post a question or comment
Credit Filters
Optimize Energy Performance—HVAC
Filter by location
Forum
Topic
Replies
Recent

accounting for equipment not listed in CPG tables

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Keith Amann  on 

The Core Performance Guide, and it's reference standard (Consortium for Energy Efficiency Commercial Unitary AC and HP Specification) has no standard for large (760 kbtu/h) systems.

1
Thu Oct 25, 2012, 1:47 pm

Partial Load Calculations & Fan Sizing

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Nick Chiarelli  on 

Hello, This project is 12 floors served by base building AHU's, pumps, chillers, etc.

1
Thu May 9, 2013, 1:29 pm

Core Performance Compliance New Air-handler- Existing Chiller

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Tom Nichols  on 

If we specify a new air handler that uses steam and chilled water from existing systems, do these systems need to comply with the CPG efficiency requirements?

1
Wed Nov 27, 2013, 8:47 pm

Conflicting Requirements in Interpretations re: Active Controls?

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Theresa Schroeder  on 

I am working on a multi-story office fitout for a single tenant, and we received a review comment on our submission regarding EAc1.3 asking us to "provide documentation that all conference rooms ha

1
Tue Jun 24, 2014, 1:43 pm

prescriptive efficiency requirements ABCPG section 2.9

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Rahul Yadav  on 

Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.

1
Mon Nov 2, 2015, 2:17 pm
1
Mon Nov 8, 2010, 3:36 pm

Detailed Plant Simulation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Chilufya Lombe  on 

Hi, we have a project with a certain number of 'back up' systems for air conditioning.

1
Tue Jul 3, 2012, 6:37 pm

active control for private offices

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Mark Taake  on 

I'm beginning to think that in many cases the private office active control requirement can be made to work for a VAV system only if each office has a separate motorized damper in the supply duct s

1
Wed Jan 16, 2013, 8:03 pm

Energy modeling

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Muzammal Abbas  on 

Dear Sir, I want to know that is it mandatory to provide energy modeling for commercial interior project's for LEED submission, Now my second question is that i am using a HAP 4.8 and eQUEST softwa

1
Mon Dec 1, 2014, 3:07 pm

Option 2: Scope and EAp2

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Marco Abdallah  on 

1) Is it possible to pursue option 2 even if all the central HVAC systems are not part of the tenant scope of work? 2) Is it possible to use the simulation (option 2) according Ashrae Appendix G al

0