Submetering requeriments for exclusive chiller for tenant space

CI-2009 EAc3:Measurement and Verification
posted by  Maria Isabel Conde  on 

The project is located within a building, its area is less than 75% of the total area of the building. The project has a chiller plant that only supplies the project area.

1
Fri Dec 15, 2017, 3:21 pm

To meter or not to meter

CI-2009 EAc3:Measurement and Verification
posted by  Rudolph Carneiro  on 

I have a store (case 1) with a small 60 ton chiller, 2 AHU's, lighting, and plug loads. If HVAC, plug loads, and lighting can be measured on one meter, how many meters do I need?

1
Mon Nov 26, 2012, 4:45 pm

BTU Metering for Existing HVAC

CI-2009 EAc3:Measurement and Verification
posted by  Jareb Ketay  on 

I have a tenant renovation project occupying 1 story of an existing 10 story building (

1
Tue Sep 23, 2014, 7:13 pm

Metering

posted by  John Bauer  on 
1
Tue Jun 22, 2010, 11:04 pm

Case 1 Option 2

CI-2009 EAc3:Measurement and Verification
posted by  breeze glazer  on 

We have a situation where the tenant space, is within a building owned, by the owner.

1
Thu May 26, 2011, 11:12 pm

case 1, however what happens if space will be owned

CI-2009 EAc3:Measurement and Verification
posted by  Courtney Royal  on 

for example, the project is a large building with a commercial spaces on each floor that will be sold.

1
Tue Apr 14, 2015, 2:46 pm

M&V case 2

CI-2009 EAc3:Measurement and Verification
posted by  Chris Miller  on 

CI project, 75% or more of the space is occupied by the tenant, and I have seen the 4/1/12 addenda with the replacement language for Case 2.

1
Tue Jan 7, 2014, 8:19 pm

Alternative Compliance Path Case 1: Lease Document

CI-2009 EAc3:Measurement and Verification
posted by  Carolina Acevedo  on 

Is there an alternative compliance approach to this credit? My project falls under Case 1 (less than 75% of the project space), but my client owns the floors hence the lack of a lease agreement.

1
Tue Jan 15, 2013, 6:52 pm

Spot Metering for CI 2009 EAc3 Option B

CI-2009 EAc3:Measurement and Verification
posted by  Michael Hill  on 

I am working on a project which is considering pursuing CI 2009 EAc3 Option B. I am wondering if continuous metering is required for this path or if spot metering would be acceptable.

1
Mon Apr 7, 2014, 1:15 pm

LEED-CI EAc3

CI-2009 EAc3:Measurement and Verification
posted by  Tapio Peltonen  on 

LEED-CI 2009 EAc3 Case 1 Online form has options for sub-metering or central plant. Does the central plant mean that the tenant space is served by e.g.

1
Thu May 26, 2011, 11:00 pm