Tenant Submetering
CI-2009 EAc3:Measurement and Verificationposted by sompoche sirichote on
I have read the previous threads but still not sure about the tenant submetering. The Table 2 in LEED CI guideline indicates that no submeter is required for the cooling if it is included in prora
initial cost for lease
CI-2009 EAc3:Measurement and Verificationposted by Monica Hue on
Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?
M&V- energy costs paid by tenant
CI-2009 EAc3:Measurement and Verificationposted by Sarah Marvez on
Our project occupies
Process Loads Description
CI-2009 EAc3:Measurement and Verificationposted by Saju Varghese on
Im trying to find out what would be considered process loads to be metere separately, is there a definition from LEED?
Energy Cost broken out in Lease
CI-2009 EAc3:Measurement and Verificationposted by Sadie Martin on
Hi, we are working on getting the verbiage of the lease correct.
ACP using v4 language
CI-2009 EAc3:Measurement and Verificationposted by Brightworks Sustainability on
LI #10418 allows LEED-NC v2009 projects to meeting the M&V credit by meeting LEED v4 enhanced commissioning, monitoring-based commissioning, and the advanced energy metering credit.
compressed air
CI-2009 EAc3:Measurement and Verificationposted by Adrienn Gelesz on
I have a manufacturing plant extension CI project were compressed air is entering the LEED space from the non-CI parts of the building. (
To meter or not to meter
CI-2009 EAc3:Measurement and Verificationposted by Rudolph Carneiro on
I have a store (case 1) with a small 60 ton chiller, 2 AHU's, lighting, and plug loads. If HVAC, plug loads, and lighting can be measured on one meter, how many meters do I need?