Sucess with prescriptive method and weighted average Tvis?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Jill Perry, PE  on 

There have been a few post here about using a weighted average Tvis for the prescriptive method in the case where the design has two or more Tvis values in the same plane.

1
Thu Feb 16, 2012, 10:18 pm

PC 9 - Open & Connected Community

Pilot-Credits PC9:Street Network
posted by  albert kovacik  on 

We were on the cusp of Gold level until our review came back with several points deducted from our energy model.

1
Wed Dec 7, 2011, 2:43 pm

Public Transportation Park and Rides

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Wendy Gibson  on 

Many tenants in our building use public transportation park and rides. They drive to a specific location, park their car and get on public transit for the rest of their commute.

1
Sun Nov 20, 2011, 1:55 pm

PC 29 - Housing & Job Proximity

Pilot-Credits PC29:Housing and Jobs Proximity
posted by  albert kovacik  on 

We were on the cusp of Gold level until our review came back with several points deducted from our energy model.

0

Purchases for repairs

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Reynaldo Castro  on 

We are a convention center and certified under pre-existing building requirements. We have a lot of shows and clients moving in and out.

1
Wed Nov 16, 2011, 8:05 pm

UNUSUAL AND UNIQUE PROCESS LOAD

NC-2009 EAp2:Minimum Energy Performance
posted by  Vindio Corro  on 

We are working in a Project which is a unique green energy research facility (the second to be built in the World), and must receive the LEED Silver standard complying with the South Carolina Energ

1
Tue Nov 15, 2011, 7:25 pm

PC 34 - Design for Adaptability

Pilot-Credits PC34:Design for Adaptability
posted by  albert kovacik  on 

We were on the cusp of Gold level until our review came back with several points deducted from our energy model.

0

Views Credit

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Suzanne Allerton  on 

Hi We are working on a community library project with expansive glazing. There is a community room in the plan that will be used for community events and conferences.

1
Wed Nov 16, 2011, 11:11 pm

IAQ managent - real live pictures

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Susann Geithner  on 

Here are some real live applications for IAQ management during construction http://on.fb.me/vboaSs

0

Building's occupants using a neighboring car park

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Doyoon Kim  on 

We have a project were we are not building any new car parks, The project building has its origins from late 19th century, so it doesn’t even have the potential, space or local government approval

0