EBOM IEQp1: Dedicated OA to classroom FCU's
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by James Doyle on
For EBOM IEQp1 we have a school using a dedicated ventilation AHU providing ventilation air to classroom FCU's.
Cooling Tower for Back-up Diesel Generators (DG)
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Anshul Chawla on
The project site has 3 cooling towers of 215 ton capacity each. These cooling towers serve the HVAC system of the building and are operational for 8-10 hrs on all working days.
VRP Compliance Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Juliana Malho on
We have a CI project with multiple zone units and VAV system. We are using template VRP compliance calculator.
Technical Rooms
CI-2009 IEQp1:Minimum IAQ Performanceposted by Juliana Malho on
Does technical rooms, as IDFs rooms needs to have outside air renovation?
Advice on acceptable approach to credit achievement for IEQc5
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Shelley Duan on
Is a covered exterior grate system (e.g, outside a vestibule) at all high volume entryways an acceptable approach to credit achievement for IEQc5? Any advice or guidance would be most appreciated.
Requirements
CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Guillermo Hernandez Espinoza on
This may seem to be a silly question, but is causing me lots of issues, is there any kind of requirement to achieve this credit other than just an all or nothing?
Target Finder
NC-2009 EAp2:Minimum Energy Performanceposted by TEY SIUNG on
We are building a Hotel in Doha, Qatar. We are try to apply for LEED certified. While I start , I meet a Target Finder problem. This Target Finder only design for US climate.
EAp2 - Compliance to ASHRAE standards
CI-2009 EAp2:Minimum Energy Performanceposted by Paolo Losi on
Hi all, we are willing to pursue LEED CI certification for our office in Italy.
Definition of hard-lid ceiling?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Renee Shirey on
I have a situation where I cannot eliminate a sloped acoustic ceiling with a gyp ceiling, and the walls do not go up to the deck (they go to the underside of trusses).
Base building EBOM credits denied
CI-2009 IDc1:Innovation in Designposted by Raphael Sperry on
I've had a pair of CIv2009 projects just denied (at first review) a couple of innovation points where the base building provides Green Cleaning, Integrated Pest Management, and a Zero-Waste Plan to