Forum quick links
If a parcel crosses the 1/4 mile radius, does it count?
CS-v4 LTc4:Surrounding density and diverse usesposted by Armond Dai on
On the map I ploted a 1/4 mile radius from the project boundary. There are lot of parcels of buildable land that are partially within the radius and partially outside the radius.
Residential clothes washers
CS-v4 WEp2:Indoor water use reductionposted by Vanessa Montezuma Ramos on
Hi everyone,
Differences between Baseline and Proposed energy model
CI-v4 EAp2:Minimum energy performanceposted by Irina Lugo on
Hi everyone, sorry if this is a bit obvious, it is my first time working with this type of LEED certification.
Site with no existing greenfield
CS-v4 SSc2:Site development - protect or restore habitatposted by Agustin Bertolotti on
Hi everyone
We are working on a site which is previously developed with no existing greenfield or natural area.
How can the MRp2 Plan be accredited in an existing building that you want to certify?
CS-v4 MRp2:Construction and demolition waste management planningposted by Carlos Bueno on
A potential existing building (with two years to go) now wants to be LEED certified.
Financial support for other organizations
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Dan Ackerstein on
Is there precedent for achieving this credit with financial support for organizations other than NFWF or Amazonas Sustainable Foundation (FAS)? There are many well-respected land trusts makin
Difficult Development Areas and Poverty Rate Qualified
CS-v4 LTc3:High priority siteposted by Hetvi Vora on
Does a site that falls under the DDA areas need to be poverty rate qualified in order for me to achieve the priority designation credit under High Priority Site?
Deep Soil mixing activity
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Summer Gorder on
Does deep soil mixing activity fall under 31.60 Foundations?
Industrial or non-regular process load
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
For a facilities with increased process load (more than 60%), other than data centers, including but not limited to industrial facilities, is there a particular guidance in establishing a baseline