Energy Requirements - Looking Ahead to EBOM 2012

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Prudence Ferreira  on 

We are working on a retail/catering facility that we cannot currently certify as NC because the addition we are doing is not large enough to qualify.

1
Thu Jan 5, 2012, 2:16 pm

converting VOC content

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Adi Negara, LEED AP BD+C  on 

Hi I receive several MSDS for the coatings that will be used in our project and inside them, the VOC content is measured in Europe (EU) which are usually expressed in percentage % (w/w).

1
Wed Feb 22, 2012, 2:55 am

About the 1/4 mile distance

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Guillermo Hernandez Espinoza  on 

Our project has access to 2 bus stops, 1 located just outside of the building's perimeter with 2 bus lines and the other one is the main one, whit main it means that's the one the 90% of the people

1
Fri Sep 14, 2012, 9:08 pm

I'm working on finalizing

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Heather Anderson  on 

I'm working on finalizing documentation for a LEED project. We have completed the calculations and are only looking about 15% savings.

1
Thu Dec 22, 2011, 12:17 am

Aggregating data

CS-2009 MRc4:Recycled Content
posted by  Eeshoo Rehani  on 

One LEED site boundary has two individual LEED projects that are under construction under one contract by the same GC.

1
Wed Feb 22, 2012, 3:26 am

WEc1

CI-2009 WEc1:Water Use Reduction
posted by  Linda Delair  on 

As 1.6 is a standard low flow toilet, in order to further reduce water use is it better to specify a 1.28 gpf or a dual flush toilet? Thank you.

1
Thu Jan 5, 2012, 11:14 pm

Pilot Credit 9

Pilot-Credits PC9:Street Network
posted by  Jeffrey Lewis  on 

I'm not sure why this point is necessary, to be completely honest.

0

LEED CS v2009 certified building

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Aaron Yorke  on 

Hi all, We have a small LEED:CI project in a CS certified shopping mall. We don't have any direct outdoor air intakes, we take the air from the main atrium and give it to our space.

1
Thu Mar 8, 2012, 11:23 pm

In a LEED certified building

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Aaron Yorke  on 

Hi all, We have a CI project in a CS v2009 certified project which achieved the development density points.

1
Wed Feb 22, 2012, 2:04 am

Pilot Credit

Pilot-Credits EApc3:Medical and process equipment efficiency
posted by  Dan Forino  on 

If we have a LEED Project that was pursuing a Pilot Credit but without knowing that it was a Pilot Credit, and are at the Submission Phase can we still apply for this credit.

1
Tue Dec 27, 2011, 5:04 pm