Energy Requirements - Looking Ahead to EBOM 2012
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Prudence Ferreira on
We are working on a retail/catering facility that we cannot currently certify as NC because the addition we are doing is not large enough to qualify.
converting VOC content
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Adi Negara, LEED AP BD+C on
Hi I receive several MSDS for the coatings that will be used in our project and inside them, the VOC content is measured in Europe (EU) which are usually expressed in percentage % (w/w).
About the 1/4 mile distance
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Guillermo Hernandez Espinoza on
Our project has access to 2 bus stops, 1 located just outside of the building's perimeter with 2 bus lines and the other one is the main one, whit main it means that's the one the 90% of the people
I'm working on finalizing
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Heather Anderson on
I'm working on finalizing documentation for a LEED project. We have completed the calculations and are only looking about 15% savings.
Aggregating data
CS-2009 MRc4:Recycled Contentposted by Eeshoo Rehani on
One LEED site boundary has two individual LEED projects that are under construction under one contract by the same GC.
WEc1
CI-2009 WEc1:Water Use Reductionposted by Linda Delair on
As 1.6 is a standard low flow toilet, in order to further reduce water use is it better to specify a 1.28 gpf or a dual flush toilet? Thank you.
Pilot Credit 9
Pilot-Credits PC9:Street Networkposted by Jeffrey Lewis on
I'm not sure why this point is necessary, to be completely honest.
LEED CS v2009 certified building
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Yorke on
Hi all, We have a small LEED:CI project in a CS certified shopping mall. We don't have any direct outdoor air intakes, we take the air from the main atrium and give it to our space.
In a LEED certified building
CI-2009 SSc2:Development Density and Community Connectivityposted by Aaron Yorke on
Hi all, We have a CI project in a CS v2009 certified project which achieved the development density points.
Pilot Credit
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by Dan Forino on
If we have a LEED Project that was pursuing a Pilot Credit but without knowing that it was a Pilot Credit, and are at the Submission Phase can we still apply for this credit.