Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Wood and recycle content

CI-2009 MRc4:Recycled Content
posted by  severine secret  on 

Is reclaimed wood considered recycled?

1
Sat Feb 4, 2012, 1:46 pm

Health Club Facility

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Sara Neff  on 

Does anyone know what documentation we provide to prove that .5% of the FTE of a project have access to the showers in a nearby health club facility? Signed statement on letterhead?

1
Fri Jan 13, 2012, 5:55 pm

Pool Cover and Air souce heat pump

NC-2009 EAp2:Minimum Energy Performance
posted by  Arub Vijay  on 

Can the mandatory requirement of swimming pool cover be exempted if an air-souce heat pump is used for pool heating? The pool is heated to 30 ºC, is the pool cover mandatory in this case.?

1
Tue Jan 10, 2012, 3:01 pm

Particulate Matter Removal

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Paula Hernandez  on 

Hi to all of you, as per Standard 62.1-2007, in Section 5.9, one of the minimum requirements for mechanically ventilated spaces, a MERV 6 filter shall be provided upstream of all cooling coils.

1
Tue Jan 10, 2012, 4:16 pm

Radiant Heat Mats

CI-2009 EAp2:Minimum Energy Performance
posted by  Holly Himes  on 

Has anyone used these on a project and which credit would then fall under if any?

1
Tue Jan 10, 2012, 5:49 pm

Developing the plan post-construction

NC-2009 EAc5:Measurement and Verification
posted by  Maura Adams  on 

Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?

1
Tue Jan 10, 2012, 9:20 pm

Bypaas VAVs and AHUs

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  monu goyal  on 

Hello to all, my query is our project is two floors in a 9 floor building. The base building developer has provided AHUs and chilled water supply.

1
Fri Jan 13, 2012, 5:41 pm

IAQ Testing AFTER Occupancy?

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  buddy pribish  on 

I am aware of the verbiage in the LEED reference guide for IAQ testing to be completed PRIOR to occupancy, but considering that the flushout method can be completed DURING occupancy, I was wonderin

1
Fri Sep 14, 2012, 11:16 pm

Shower for a transportation hub

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Kevin Meyer  on 

We are working on a transportation hub next to a stadium. The project won't have any full time employes on site.

1
Fri Jan 13, 2012, 12:22 am

Active Design- LEED ID credit Physical Activity- LEED NC & CI

CI-2009 IDc1:Innovation in Design
posted by  Baani Singh  on 

You can earn a LEED ID credit by promoting Physical activity in your building. Most of the strategies are already in LEED CI& NC.

0