Help with Submittal Documentation
Pilot-Credits PC4:Innovative Ventilationposted by Erik Ruoff on
Hi LEED Users – I am working on a project that is pursuing an ID credit under Pilot credit 2. We have registered and been accepted for the pilot credit & submitted the feedback survey.
Exemptions
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Andreas Gyr on
I am working on an international project that has novelty lighting and lighting that displays cafe food. Are either of these exempt from EAc1.1?
Criteria of choosing CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Patana Rattananavathong on
There are about 3 CxA sent me their proposals. This is my first project and I wonder that are their any criteria for choosing CxA.
SSc4.2 / Sample Form Error / Bicycle Storage Number
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by BH . on
Hi, Do you have the same problem that for bicycle racks Sample Form (SSc4.2) is taking to account number of peak building users from PIF3 instead of average?
Post-certification - Does MRc3 apply to new tenants?
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Stacey Olson on
We have a signed lease to proceed with a tenant imrovement in a multi-occupant EBOM Gold buidling.
GWP / ODP of Water & Lithium Bromide
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Jens Apel on
In our project a absorption chiller will be used to cover part of the cooling load. The chiller will run on lithium bromide / water solution.
Division 12 included
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Jennifer Berthelot-Jelovic on
I don't have my LEED Reference Guide with me. I am working on a Lab. There is millwork included in Division 12 for the Casework.
Roof Area definition
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by David Tompos on
The definition for roof area indicates that only the roof area directly above the Gross Square Footage should be used for the Option 1 - 75% calculation.
Space types included in IEQ 4 credits ?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Timo Rintala on
Hi My questions conserns calculation of VOC:s from technical & garage spaces.
Counting FTE from future developments?
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Anne-Maria Vierinen on
We have a master plan campus project for which we are trying to acheive several credits which, once achieved, can then be easily shared and applied for in the 3 individual projects which will event