Counting FTE from future developments?

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Anne-Maria Vierinen  on 

We have a master plan campus project for which we are trying to acheive several credits which, once achieved, can then be easily shared and applied for in the 3 individual projects which will event

1
Mon Feb 6, 2012, 2:41 pm

Electric Cigarettes

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Andreas M. Roessler  on 

Dear all, one of our major clients set an interesting question concerning electronic cigarettes.

1
Sat Feb 18, 2012, 3:20 am

Base model minimum efficiencies

NC-2009 EAc1:Optimize Energy Performance
posted by  Ming Feng  on 

Hi, I have a question about baseline building HVAC minimum efficiency.

1
Tue Jan 31, 2012, 7:57 pm

90.1-2007 Table G3.1.1A for Additions and Alterations

NC-2009 EAp2:Minimum Energy Performance
posted by  Evelyn Dicks, EI, CxA  on 

Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations?

1
Tue Jan 31, 2012, 10:30 pm

Furniture Used from Previous Location in New Site

CI-2009 MRc4:Recycled Content
posted by  Michelle Bracewell-Musson  on 

First of all, I LOVE this site as it is so helpful and has saved me so much time! THE ISSUES I have documented the reused furniture in MR c3.2 Materials Reuse - Furniture and Furnishings and I know

1
Sat Feb 4, 2012, 2:07 pm

ABSL-3 Baseline vs. Proposed Fan Energy for RTU

NC-2009 EAc1:Optimize Energy Performance
posted by  Michael O'Brien  on 

I've recently come across a deblitating problem as it pertains to the energy modeling of an ABSL-3 space.

1
Tue Feb 14, 2012, 3:57 pm

IAQ Concerns due to LEED boundary

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Kunjan Shah  on 

My project is inside a 3 story building. The remodel work spans all 3 floors and City permit drawings show work all over the building and building shell.

1
Wed Feb 22, 2012, 2:16 am

CIR for process condition that allows exclusion of space?

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  CRB Sustainability  on 

Hi, For a building that has a specific requirements for manufacturing areas to be at temperature/humidity setpoints that fall outside of ASHRAE 55-2004 is there a CIR that anyone else has found th

1
Wed Jan 30, 2013, 2:20 pm

My team and I have reduced

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Alicia Villanueva  on 

My team and I have reduced water use in a project through dual flush fixtures, low flow urinals, low flow lavatories and low flow shower heads by more than 25%.

0

Recycled Content Range

CI-2009 MRc4:Recycled Content
posted by  Jennifer Berthelot-Jelovic  on 

What does USGBC/GBCI accept when you have a range of recycled content. For example, Sika/Sarnafil has a 5-10% Post consumer recycled content on one of their projects in their documentation.

1
Fri Feb 3, 2012, 7:56 pm