Existing Imperviouness

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Markus Henning  on 

My question is. The Guide says choose Case 1 Sites with Existing Imperviousness 50%or less or Case 2 Sites with Existing Imperviousness greater than 50%.

1
Sat Feb 11, 2012, 1:22 am

Baseline Exhaust Fans vs. Proposed ERV

NC-2009 EAp2:Minimum Energy Performance
posted by  Candice Rogers  on 

I am modeling a building that directs all building exhaust through an energy recovery ventilator, including bathroom exhaust.

1
Tue Feb 14, 2012, 3:24 pm

ARI Certification for VRF equipment in LEED-NC 2009

NC-2009 EAp2:Minimum Energy Performance
posted by  Mauricio Ramirez  on 

Talking about a VRF HVAC system. Is it a mandatory requirement that the VRF condenser and evaporative units must be ARI Certified, according with the Standard 90.1-2007?

1
Tue Feb 14, 2012, 3:26 pm

external lighting LPD contribution to percentage energy savings

CS-2009 EAc1:Optimize Energy Performance
posted by  Puteri Shireen Jahnkassim  on 

Hello there What does this mean : Ensure that no credit is taken in the proposed case for lighting reduction on tradable surfaces" Does this mean if the LPD for facade lighting for a designed b

1
Mon Feb 13, 2012, 2:35 pm

LPD for space with higher headroom

NC-2009 EAc1:Optimize Energy Performance
posted by  William Wong  on 

Does anyone know what headroom height are based on when ASHRAE design the LPD for space-by-space method (Table 9.6.1) ?

1
Mon Feb 13, 2012, 2:41 pm

Occupancy Fitness Center

CS-2009 WEp1:Water Use Reduction
posted by  Ralf Lehmann  on 

Has anyone of experience in including a fitness center m to an office building. One of the tenants of our Project will be a fittness center. All fit outs will be done by the tenants.

1
Wed Feb 22, 2012, 1:49 pm

Non-fibrated aluminum paint

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Bruce Maine  on 

This is actually a LEED for Healthcare question dealing with exterior applied products. In several roofing sections we ask for "non-fibrated aluminum paint".

1
Tue Feb 21, 2012, 5:35 am

Office Space With 25% Data Center Changing to 100% Office-June

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Michelle Bracewell-Musson  on 

There are four buildings that are leased by the State and one of the buildings currently has 25% if it as a Data Center.

1
Mon Feb 20, 2012, 6:41 pm

Recycling Areas Designation

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Sunayana Jain  on 

In the floor plan, is it required to document the recycling areas as paper, corrugated cardboard, glass, plastics and metals specifically or just designating as recycled areas in floor plan will be

1
Sat Feb 18, 2012, 12:31 am

Entering "total project space equipment capacity" - LEED form

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Seema Pandya  on 

In the LEED Online form for option 1 section 1.4: Mechanical System Design Criteria, there is a place for you to enter the total space loads for heating and cooling and another entry that asks for

1
Fri Mar 16, 2012, 6:22 pm