Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEEP AP,

CI-2009 IDc2:LEED Accredited Professional
posted by  Cyril Knabe-Nicol  on 

Hello, everyone, I just wanted to have clarification regarding the LEED AP, if we have in the design team or in the team undertaking the Assessment someone who is a LEED AP.

1
Tue Feb 21, 2012, 5:34 am

Land trust

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Gabriela Hernández Castillo  on 

Our project has very limited landscape options and I just found out about the offsite land donation. We are by no means familiar with the Land trust nor the EPA level III ecoregion.

1
Tue Feb 21, 2012, 7:56 pm

Minimum ventilation in Storage, electrical rooms, lift m/c rooms

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Arub Vijay  on 

Do we need to comply with the ventilation rates in Table 6-1 (ASHRAE 62.1-2007) for electrical rooms, lift machine rooms, electrical rooms etc?

1
Fri Feb 24, 2012, 7:59 pm

Misunderstood case 1

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Stéphane Paris  on 

I'm working on a project in an urban space that have Local Zoning Ordinance.

1
Wed Feb 22, 2012, 2:52 am

Another CxA Scenario?

NC-2009 EAc3:Enhanced Commissioning
posted by  Christopher Heine  on 

We have a project over 50,000 sf in DD phase and are in early talks with a potential Facility Manager. Can a FM or a disinterested party from that FM firm serve as a CxA for EAc3?

1
Fri Mar 9, 2012, 4:24 pm

Energy Modeling with California T24-2008

NC-2009 EAc1:Optimize Energy Performance
posted by  eileen hughes  on 

Will the GBCI accept the model if it is completed based on Title 24 -2008 energy standard in lieu of the T24-2005 or ASHRAE 90.1-2007?

1
Tue Feb 21, 2012, 8:11 pm

Flexibility

NC-2009 IDc1:Innovation in Design
posted by  Denise Newbould  on 

Is it okay to pursue more than one path to obtain ID credits?

1
Tue Feb 21, 2012, 7:49 pm

Required Signatory IEQp2-1 form?

Schools-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Joel Register  on 

On the form for this credit, there is an option to upload IEQp2-RS1.

1
Tue Jun 12, 2012, 5:50 pm

How to define the "project's energy-related systems"?

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Andrew Gil  on 

I am seeking clarity on this point given the GCBI's June 2011 update of MPRs and the current emphasis on defining a project "in it's entirety".

1
Thu Jul 5, 2012, 3:01 pm

Existing System with New Chiller Plant

NC-2009 EAp2:Minimum Energy Performance
posted by  Ante Vulin  on 

Our project is an existing 36,000 sf museum with a planned 18,000 sf addition. The existing portion is served by a dual-duct HVAC system with a boiler and chiller plant.

1
Wed Feb 22, 2012, 4:18 pm