Forum quick links
LEEP AP,
CI-2009 IDc2:LEED Accredited Professionalposted by Cyril Knabe-Nicol on
Hello, everyone, I just wanted to have clarification regarding the LEED AP, if we have in the design team or in the team undertaking the Assessment someone who is a LEED AP.
Land trust
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gabriela Hernández Castillo on
Our project has very limited landscape options and I just found out about the offsite land donation. We are by no means familiar with the Land trust nor the EPA level III ecoregion.
Minimum ventilation in Storage, electrical rooms, lift m/c rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Arub Vijay on
Do we need to comply with the ventilation rates in Table 6-1 (ASHRAE 62.1-2007) for electrical rooms, lift machine rooms, electrical rooms etc?
Misunderstood case 1
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Stéphane Paris on
I'm working on a project in an urban space that have Local Zoning Ordinance.
Another CxA Scenario?
NC-2009 EAc3:Enhanced Commissioningposted by Christopher Heine on
We have a project over 50,000 sf in DD phase and are in early talks with a potential Facility Manager. Can a FM or a disinterested party from that FM firm serve as a CxA for EAc3?
Energy Modeling with California T24-2008
NC-2009 EAc1:Optimize Energy Performanceposted by eileen hughes on
Will the GBCI accept the model if it is completed based on Title 24 -2008 energy standard in lieu of the T24-2005 or ASHRAE 90.1-2007?
Flexibility
NC-2009 IDc1:Innovation in Designposted by Denise Newbould on
Is it okay to pursue more than one path to obtain ID credits?
Required Signatory IEQp2-1 form?
Schools-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Joel Register on
On the form for this credit, there is an option to upload IEQp2-RS1.
How to define the "project's energy-related systems"?
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Andrew Gil on
I am seeking clarity on this point given the GCBI's June 2011 update of MPRs and the current emphasis on defining a project "in it's entirety".
Existing System with New Chiller Plant
NC-2009 EAp2:Minimum Energy Performanceposted by Ante Vulin on
Our project is an existing 36,000 sf museum with a planned 18,000 sf addition. The existing portion is served by a dual-duct HVAC system with a boiler and chiller plant.