Forum quick links
Pre-Engineered Wood Trusses?
NC-2009 MRc7:Certified Woodposted by Kory Beighle on
When the credit states that..."These components include at a minimum, structural framing and general dimensional framing, flooring, sub-flooring, wood doors and finishes." Does this include pre-eng
Calculating VLT- Glazing Only or Full Assembly
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Greengrade User on
Does anyone know if the VLT factor inserted into the day lighting prescriptive path spreadsheet is for the glazing only, or is it supposed to factor in the mullions/screens?
Existing Building for LEED on Campus - EBOM Path
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by David Tetro on
I am working on a building for LEED Certification - it is one of several buildings on campus (the others are not going for LEED status at this time).
Offsite showers FTE, please help
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Sara Neff on
Our project has bike racks and showers in an adjacent facility.
Documentation of Roof - In General
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by David Tetro on
Hi all - just a question as I am new to this... I am looking to get certification for an existing building (EBOM) and I have all the drawings in CAD - however, under normal circumstances, there are
LPD category for double height entrance hall
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Felipe Duran on
We have a residential project - with a double height entrance lobby (main entrance to the bldg) - and I am not sure how to calculate the LPD for this space - should I treat it as: 1) Lobby (14W/m2
acceptability criteria of approximate HVAC models
CS-2009 EAp2:Minimum Energy Performanceposted by Rosana Correa on
Dear All, I am modeling an existing building with a Water-cooled VRF HVAC system.
Non-fossil fuel in district heat
NC-2009 EAp2:Minimum Energy Performanceposted by Jens Apel on
This question relates to the thread below (“Absorption chiller in baseline model”) but is of more general nature.
The reclaim water project on going
EBOM-2009 WEc3:Water Efficient Landscapingposted by Linh Huynh on
Hi, I am working on a LEED project. My performance period is from April to July, 2012.
2012 public comment
Pilot-Credits EApc67:Energy Jumpstartposted by Tristan Roberts on
For more background on why this pilot credit exists, and what it means for LEED-EBOM 2012, see this great discussion on our 2012 public comment forum.