Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Water consumption calculation - showerhead flow rate pressure

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  GPS Development   on 

I'm working on a LEED project in Asia. The water pressure for shower here is set at 3.5 bar (~50 psi). However, the baseline used by LEED is 2.5gpm at 80 psi.

1
Mon Apr 16, 2012, 2:30 pm

Modeling DCV in open space offices

CS-2009 EAp2:Minimum Energy Performance
posted by  Lucie Cervena  on 

I am in the process of simulating 7 floor office building. Five of these floors are designed as open space offices, the others are designed as small offices.

1
Thu Apr 12, 2012, 1:45 pm

wood

CI-2009 MRc2:Construction Waste Management
posted by  Juliana Malho  on 

Whern you burn a wood that was diverted from landfills, is it considered recycling??

1
Tue Jun 12, 2012, 2:22 pm

Laminating Adhesive proof of no UF

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Laura Charlier  on 

We submitted an MSDS as proof of no urea-formaldehyde in a laminating adhesive and got this response from the reviewer: An MSDS that does not list urea-fomaldehyde is not confirmation that the pro

1
Thu Apr 12, 2012, 8:09 pm

This classification confuses to me

Pilot-Credits EApc67:Energy Jumpstart
posted by  Bill Swanson  on 

I'm not understanding why this is a Pilot Credit. Per USGBC's website. "What is the Pilot Credit Library and its purpose? a.

0

Eggshell

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Fernanda Cortes  on 

If a paint contains in its composition grams of mashed eggshell, is this component considered a rapidly renewable content ?

1
Thu Apr 12, 2012, 7:44 pm

Architect Signatory

NC-2009 EAp2:Minimum Energy Performance
posted by  Christopher Getz  on 

Does the Architect Signatory have to be a LEED AP? or just a registered Architect?

1
Thu Apr 12, 2012, 6:54 pm

AHU measurements

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Luis Parada  on 

In our building we have two main AHU that supply 26 AHU (one for each floor of the building) and then we have VAVs for each zone in each floor. Do I need to perform measurements just in the two ma

1
Tue Dec 11, 2012, 7:37 pm

'Leaks in Return Ducts and Air Handlers..be checked..repaired'

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Michelle Bracewell-Musson  on 

The Contractor will not be using the HVAC during a minor alteration and there is no HVAC scope except for Air balancing and cleaning of ductwork. How much sealing is required?

1
Fri Apr 13, 2012, 6:44 pm