Pilot Credit 45

Pilot-Credits SSpc45:Site assessment
posted by  Rachel McCaffery  on 

I wonder if there would also be value in evaluating some environmental site considerations as part of this credit, potentially including: -previous site remediations -presence of above/below ground

0

Documentation Word of Caution

CI-2009 MRc5:Regional Materials
posted by  Matthew Fortin  on 

I may just have a bad reviewer, but I wanted to warn people starting the process so they don't end up in the same situation as myself.

0

Appeals

NC-2009 EAp2:Minimum Energy Performance
posted by  J Morrison  on 

I have been told by our very reputable Design firm that is is not unusual to have two design appeals on the EA credit 1 and prerequisites.

1
Tue May 8, 2012, 1:16 pm

IEQp3 Entryway Systems

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Maria Vasapollo  on 

Does anyone know if the 10ft long entryway mats can be split into two mats?

1
Wed May 23, 2012, 2:09 pm

Durable Goods Purchase

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Janna Nash  on 

Could someone tell me if this would apply as a Durable Good purchase?

1
Mon Jun 4, 2012, 11:34 pm

Impervious Area

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Greengrade User  on 

Am I correct in assuming that even though our total impervious area on the site will increase, we can achieve this credit by implementing treatment strategies that capture 90% of the storm water ru

1
Tue May 15, 2012, 2:54 pm

I recently stumbled upon a

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Chloe Bendistis  on 

I recently stumbled upon a strange requirement for aerosol adhesives in the IEQ c4.1 credit form v2009 that is NOT listed in the addenda.

0

Addressing playing fields at a school in SSc2 & SSc3

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Jessica Hawley  on 

Our client is a school with multiple playing fields on the project site.

1
Thu Jun 21, 2012, 9:01 pm

partial renovation / partial expansion EAc1 points

CS-2009 EAc1:Optimize Energy Performance
posted by  Katherine Ann Resurreccion  on 

We've learned that for projects with partial renovation and partial expansion a new points thresholds should be calculated for EAc1.

1
Wed May 9, 2012, 12:17 am

Site Selection - Historic Landmark

NC-2009 SSc1:Site Selection
posted by  David Cloutier  on 

Question: If you performing a Major Renovations with no addition to an existing Historic Building in a Historic Landmark and the project requires minimal new parking spaces and new walkways and the

1
Thu May 31, 2012, 7:59 pm