Forum quick links
When Fundemental Commissioning Should start
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jalal Avades on
We have a project that is currently in construction and the client would like to go LEED.
Using AEDG
NC-2009 EAp2:Minimum Energy Performanceposted by David Tratt on
There are two AEDG's for small office buildings. Which should be used for a 12,000 sf building to achieve the 10-14% improvement over 2007? The 30% or the 50%?
Fresh Air Measurements on Rooftop Units
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Christopher Pinkowski on
I am applying this credit to ten rooftop units that lack a straight duct section long enough to traverse with a pitot tube.
Football field is a countable area?
NC-2009 WEc1:Water Efficient Landscapingposted by Marcio Alberto Casado Pereira on
I dont know if anybody had asked this before, but does the football field counts in the sum of the total landscape area of a football arena? We are working on a project that all the landscape area,
Natural Ventilation
NC-2009 IEQc2:Increased Ventilationposted by Torsten Biernat on
We have a four story office building with natural ventilation. All the rooms are single-sided. We want to show that the window area is big enough to exceed the ASHRAE requirements by 30%. 1.
Heating and Cooling Ez, and Occupant Diversity
NC-2009 IEQp1:Minimum IAQ Performanceposted by Hernando Miranda on
It seems that the certification reviewers do not know when heating and cooling occur in a space.
Survey and different Response Time
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Mario Kranzl on
A survey have been conducted at the conclusion of 5 consecutive workdays, holidays not included, as required by credit.
SS c.3.2 Secure Bicycle Storage instead of bicycle racks
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Kasia Trojanowska on
We identified secure bicycle storage with pass code locker for exclusive use of project's occupants within a garage structure attached to the office building.
Lighting Controls in Multi-occupant Spaces
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Geoffrey Tomlinson on
I'm confused about the credit requirements.
How to account for Transients when defining Fixture Usage Groups
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Gabriele E. Bibee on
We have an office building/warehouse that also has an exhibit/social gathering space with a large number of transients. Some of the building users are closest to unisex toilets only.