Forum quick links
Detailed Plant Simulation
CI-2009 EAp2:Minimum Energy Performanceposted by Chilufya Lombe on
Hi, we have a project with a certain number of 'back up' systems for air conditioning.
Fan Power in the Proposed Building Design (C&S)
CS-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
I'm working on a project pursuing LEED Core&Shell Certification and I'm not sure about the following matter: What is the correct approach when simulating fan power in the proposed case for ten
EnergyPro printout vs EAp2-Section 1.4 Tables
NC-2009 EAp2:Minimum Energy Performanceposted by Robert Robison on
Is it really necessary to fill out the EAp2-Section 1.4 Tables spreadsheet when it looks to me like EnergyPro provides all the same data in the exact same format?
Template and Minimum Standards
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Maggie Hogan Skaug on
I'm just diving into this credit with my client, not as a LEED existing buildings ssc3 credit, but using it as an Innovation in Design credit for NC.
LARGE PROJECT SITE
NC-2009 SSc2:Development Density and Community Connectivityposted by LEED Pro Consultant on
Hello, When the project site is too large compared to the project area and it's been developed like a Campus is there an special way to proceed to consider option 1 to gain this credit?
Alternative compliance path: Core & shell 2009 EAp2
CS-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
I am working on a Core and Shell Project and I would like to use the calculator of alternative compliance path for reducing the percentage of saving needed to meet EA the prerequisite 2.
Are “default values” and “estimated values” the same thing?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Patrick Culhane on
Our office building has data center space which is submetered but before the UPS rather than after.
secondary use of well water
EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Noriko Nagazumi on
Our project will use well water for HVAC/ ooling tower first then reuse it for flush of water closet. We assume it can be regarded as gray water even if it is derived from well first.
Increased energy consumption by a single tenant
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Anna Korinkova on
Hi all! How to correctly input energy data (to ES Portfolio Manager) for an office building where a tenant (bank) has it's own chiller, consumes almost one third of the total building energy consum
Non ES rated Oven project in europe
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Cyril Knabe-Nicol on
Hello everyone, I have a LEED CI in europe and i have an issue with an oven, it is non ES rated and the manufacturer do not have any information in btuh.