No-smoking Signage provided as part of tenant package
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by S. Sachs on
Hi, I am working on a LEED CS project with a single tenant. The tenant has a no-smoking policy and is providing signage throughout the property and building.
Commissioning Agent Experience Template Form
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by nalat yulong on
The commissioning agent for our project indicated there is a LEED template he has completed in the past documenting his experience as an agent on similar projects and detailing his certifications.
Exterior Lighting special circumstances
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Luis Miguel Diazgranados on
Hello Everyone: First of all, I have read previous posts, and I have seen that this subject has already been discussed, but the way I see it, in this case it might be a special circumstance. We a
Different showers in Wellness / Fitness Center
CS-2009 WEp1:Water Use Reductionposted by Ralf Lehmann on
Within a typical fitness center including a sauna there are different types of showers. 1.
Standard flush fixtures automatically gives credit in my county
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Maria Porter on
I just wanted to hear thoughts about the fact that our standard flush fixtures reduce water usage by 56 %, without us doing anything.
Safe pedestrian access to the building please!
Pilot-Credits PC14:Walkable Streetsposted by Maria Porter on
I would like to see this credit evolve to include pedestrian access to the building. Most cities in my country are very pedestrian oriented and can comply with this credit´s requirements.
Daylight simulation for office building
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Lucie Cervena on
LEED reference guide said that in Option 1 compliance should be demonstrated through computer simulation of all regularly occupied spaces.
Urinals are not everywhere
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Tatjana Ernst on
Hi Everyone, we have a building which has 37 dual flush for men and 8 Urinals, the Urinals are not in every toilet room (for example there are no urinals in the basement), there will be only one
Proposed Building Envelope Assembly Thermal Properties
CS-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
How do I calculate the U-factor for the construction assembly (e.g walls) according to ASHRAE 90.1-2007 Appendix A if one or some of the construction layers properties are not specified in the ment
New Bus Routes, not yet operational
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Douglas Ross on
In the Design Submittal, I uploaded a letter from the local transit authority that two bus routes were planned and funded; however, they were not operational because the employees had not moved to