Forum quick links
Uploading EPDs to LEED Online
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Dane Andersen on
Hello, it's my first time uploading this credit to LEED Online. Does anyone know if it is acceptable to upload a zip folder containing all the EPD PDFs (30+ in total)?
Testing strips - other manufacturers
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Beth Brownlie on
Has anyone had any experience with other manufacturers for the testing strips. Also, what has been the adoption rate of this testing protocol with cleaning staff?
TRUE Waste Certification Advisor Recommendation
EBOM-v4.1 MRp3:Waste Performanceposted by Daniel Bertschinger on
Hello Everyone!
I would like some recommendation of companies that can act as advisors for the TRUE Waste certification for an operating manufacturing plant.
Kindly regards,
Menstruation hygiene products
Pilot-Credits WEpc147:All-Gender Restroomsposted by Sara Goenner Curlee on
I posted this question in a string under Innovation, but will duplicate here under the official Pilot Credit forum to show participation and perhaps gather feedback.
Mixed-use building
NC-v4 LTc8:Green vehiclesposted by CT G on
We are working on a project with three towers (30 floors above grade) with a common base (ground floor and the first two floors are shared by the three towers).
EV space accessibility
NC-v4.1 LTc8:Electric Vehiclesposted by Lawrence Rennell on
Do all EV spaces required to be available to the general public?
Non-linear primary direction of travel.
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Michelle Halle Stern on
Our entry includes a centered revolving door with people doors on either side.
MRpc103 Integrative Analysis of Building Materials
NC-v4 INc1:Innovationposted by Lisa Bolle on
As our project team was performing the analysis of three products, we realized that another potentially useful strategy would be to compare three similar products and use the integrative analysis w
Pilot credit Requirement
Pilot-Credits SSpc55:Bird collision deterrenceposted by on
Commenting to comply with credit requirements. Credit language is clear and the team was able to implement without trouble. The project used a highly reflective glazing to comply.
High Rise Residential
NC-v4 EAc3:Advanced energy meteringposted by Megan White on
We have a 24 story high rise residential apartment project that wants to pursue this credit however we are looking for guidance as this seems more geared towards commercial office projects with mul