Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Addenda to ASHRAE standards

CS-2009 EAp2:Minimum Energy Performance
posted by  Jens Apel  on 

Edit: question has already been answered in February 2012 here: http://www.leeduser.com/credit/CI-2009/EAp2 Didn't find it before, sorry for any confusion. Dear all, on several spots in the Ref Gu

0

great

CS-2009 EAp2:Minimum Energy Performance
posted by  Mary Wilkerson  on 

nice thread. very interesting.

0

Does packaging count?

Schools-2009 MRc4:Recycled Content
posted by  Kathy Trejo  on 

I recently recieved recycled content information for a products packaging, caulking tubes, paint pails, etc.

1
Fri Aug 31, 2012, 2:37 pm

Dormitory LPD

NC-2009 EAp2:Minimum Energy Performance
posted by  Rebekah Burke  on 

We have a 4 story college dormatory building, 113,000 SF.

1
Thu Jun 7, 2012, 9:37 pm

Calcium Magnesium Acetate?

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Elizabeth Crenshaw Hammitt   on 

Our purchasing team recently bought an ice melter that contains Calcium Magnesium acetate, which is not one of the three options that LEED specifies.

1
Thu Jun 21, 2012, 10:48 pm

shuttle service instead of preferred parking space

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Karyn Rodrigues  on 

Our LEED CI project is inside of a LEED CS retrofit. For SS3.3 my client falls under the CASE 1.

1
Thu Sep 6, 2012, 1:16 am

PV Installation during EAp2 and EAc1 performance period

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  David Tompos  on 

My group is currently planning to have photovoltaic panels and the appropriate electricity meters installed on the LEED EBOM project building.

1
Fri Oct 5, 2012, 3:55 pm

Fume hood & Isolated Exhaust Requirement

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maggie Hogan Skaug  on 

Our client has a fume hood in one of their laboratories but it is not within an enclosed room all to itself.

1
Fri Jun 8, 2012, 8:19 pm

Salvaged granite block

NC-2009 MRc3:Materials Reuse
posted by  Sara Sweeney  on 

Hi I am working on a project where 83.75 tons of granite slabs were removed from a site during site clean-up for the new bilding being built.

1
Mon Jun 11, 2012, 4:12 pm

Private Lav Faucets - Baseline vs. Metered Design

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vincent Pieri  on 

We are working on a single floor, single tenant project with several fixture group assignments.

1
Wed Sep 5, 2012, 10:46 pm