Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

compliance for rentals spaces in LEED-NC

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  MAUDE PINTAL  on 

I can not find any instruction for tenant space that are provided without any layout.

1
Tue Jul 3, 2012, 7:36 pm

Multiple types of medical office

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Maura Adams  on 

My review team said that four of my ten basic services were medical offices and that I could only count that service once.

1
Thu Jul 12, 2012, 5:06 pm

Equation 3 Help

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Sam Watters   on 

I see that equation 3 in the reference manual performs the calculation for Q, the peak runoff rate, but I do not see how this value is used to calculate the amount of water retained on site. How d

1
Tue Oct 9, 2012, 2:59 am

Automatic Lighting Shutoff for tenant spaces

CS-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

Do tenant spaces need to be included in the areas controlled by the automatic shutoff as mentiaoned in section 9.4.1.1 (ASHRAE 90.1)?

1
Thu Jul 26, 2012, 4:26 pm

U-value unheated/heated slab-on-grade floor

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

Hello. In the building which I’m modeling there is an underground floor whose slab-on-grade floor can be considered as divided in three parts: one part (wellness) is heated with heated floor, anoth

0

Two on/off switches for multi-occupant space

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  SON NGUYEN VAN  on 

Our building had two types of power source, one is normal power, one is essential power (back up by genset) and also supply two kind of power for lighting system.

1
Wed Sep 5, 2012, 12:03 am

Blower Door Test Required?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Wei Jiang  on 

We have a high-rise hotel project with all guest rooms in the tower and hotel facalities (restaurants, meeting rooms, gym, etc.) in the podium.

1
Thu Jul 5, 2012, 2:40 pm

district CHP system

NC-2009 EAc1:Optimize Energy Performance
posted by  Giorgia Lorenzi  on 

I am modeling a building which is connected to a district CHP system.

1
Thu Jul 12, 2012, 6:57 pm

Offsite Landscape

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Irina Serrano  on 

I'm working on a project in Sao Paulo, Brazil and our project will implement a green area (1506.95 sf) outside our leed project boundary.

1
Sat Jul 14, 2012, 5:49 pm

Utilizing a Campus Shuttle to connect to Public Transit

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Eamon Geary  on 

For a military base project, the facility is connected to a campus shuttle with 20+ stops.

1
Thu Jul 5, 2012, 8:03 pm