Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

single stream recycling

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Adam Targowski  on 

Will the requirements of this prerequisite be complied with only by having a waste storage room for the whole building with one container for a single stream recycling (that will accommodate all fi

1
Wed Jul 18, 2012, 4:30 pm

no change of flow fixtures

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Adam Targowski  on 

We have a project that consists of an office space with toilets however the folw fixtures are not going to be changed. Is this project exempt from earning this prerequisite?

1
Fri Aug 31, 2012, 12:03 am

Wooden fire door - security requirement

CS-2009 MRc6:Certified Wood
posted by  Jose Antonio Kovacevic  on 

We are certifying a Core and Shell office building.

1
Fri Aug 31, 2012, 3:05 pm

Minimum drawdown rate calculation

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Meryl Corsun  on 

I am trying to verify that the cisterns on site release stormwater quickly enough to capture 2-year 24-hour design storm events by calculating the minimum drawdown rate.

1
Fri Nov 23, 2012, 9:11 pm

Location of the sign "You are entering a no smoking area"

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Gail Shepherd  on 

We are using option 2 - prohibit on-property smoking within 25 feet of entries....The owner has asked if they can locate these signs on the building door.

1
Fri Jul 27, 2012, 7:32 pm

PUDs

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Peter Doo  on 

Is parking that is negotiated as part of a Planned Unit Development (PUD) considered the same as a zoning requirement?

1
Thu Sep 6, 2012, 1:13 am

toilets and urinals with fluximeters

CS-2009 WEp1:Water Use Reduction
posted by  Ron Dean  on 

according to the picture you see on the books for pre-requisites, I want to know if there is any restriction of use of toilets and urinals with fluximeters, or just in all cases require only that d

1
Wed Sep 5, 2012, 10:18 pm

GE Profile 21.7 &15.5 Cu. Ft. Top-Freezer Refrigerators

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Waylon Lo  on 

We've tried and cannot get any info from GE other than they use R-134A refrigerant.

1
Thu Jul 19, 2012, 3:16 pm

HVAC Contractor as CxA for EAp1?

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Tony Schafer  on 

Is it possible for an employee of the HVAC contractor to be the CxA for fundamental commissioning only?

1
Thu Jul 19, 2012, 7:43 pm

Alternative Compliance Path for Projects outside the US

CI-2009 IEQc2:Increased Ventlilation
posted by  Marco Abdallah  on 

Hi, can we use the "Alternative Compliance Path for Projects outside the US" which has been launched for New Construction and Major Renovations for a CI Project? The credit content & requiremen

1
Thu Jul 26, 2012, 4:04 pm