single stream recycling
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Adam Targowski on
Will the requirements of this prerequisite be complied with only by having a waste storage room for the whole building with one container for a single stream recycling (that will accommodate all fi
no change of flow fixtures
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Adam Targowski on
We have a project that consists of an office space with toilets however the folw fixtures are not going to be changed. Is this project exempt from earning this prerequisite?
Wooden fire door - security requirement
CS-2009 MRc6:Certified Woodposted by Jose Antonio Kovacevic on
We are certifying a Core and Shell office building.
Minimum drawdown rate calculation
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Meryl Corsun on
I am trying to verify that the cisterns on site release stormwater quickly enough to capture 2-year 24-hour design storm events by calculating the minimum drawdown rate.
Location of the sign "You are entering a no smoking area"
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Gail Shepherd on
We are using option 2 - prohibit on-property smoking within 25 feet of entries....The owner has asked if they can locate these signs on the building door.
PUDs
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Peter Doo on
Is parking that is negotiated as part of a Planned Unit Development (PUD) considered the same as a zoning requirement?
toilets and urinals with fluximeters
CS-2009 WEp1:Water Use Reductionposted by Ron Dean on
according to the picture you see on the books for pre-requisites, I want to know if there is any restriction of use of toilets and urinals with fluximeters, or just in all cases require only that d
GE Profile 21.7 &15.5 Cu. Ft. Top-Freezer Refrigerators
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Waylon Lo on
We've tried and cannot get any info from GE other than they use R-134A refrigerant.
HVAC Contractor as CxA for EAp1?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Tony Schafer on
Is it possible for an employee of the HVAC contractor to be the CxA for fundamental commissioning only?
Alternative Compliance Path for Projects outside the US
CI-2009 IEQc2:Increased Ventlilationposted by Marco Abdallah on
Hi, can we use the "Alternative Compliance Path for Projects outside the US" which has been launched for New Construction and Major Renovations for a CI Project? The credit content & requiremen