Forum quick links
Plaster Recycling
CI-2009 MRc2:Construction Waste Managementposted by Greengrade User on
Hi all, I am working on an interior renovation for a buidling that was built in 1907.
Regular building occupant definition
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Tiffany Moore on
I may have yet another question that falls under the larger issue of vague occupant definitions, but I'm going to ask anyway. I have a client with very detailed reporting of employee transportatio
LEED AP registering a CI project
CI-2009 IDc2:LEED Accredited Professionalposted by Alicja Bieszyńska on
I'm a LEED AP BD+C and I'm going to register a CI project in LEED 2009 system.
Tristan,
Refering to my
CI-2009 MRc2:Construction Waste Management
posted by Greengrade User on
Tristan, Refering to my comment below, the only thing I can think of right now is to seperate the demo process into two parts.
IEQc3.2 VOC Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by mark morehouse on
I have a 191,000 sf nc school that will require 11 sample points.
Efficiency curve
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
The efficiency of the boiler that I’m modeling has to respect Table 6.8.1F of ASHRAE 90.1:2007.
Laminating Adhesives
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Joseph Greene on
Hoping for some collective wisdom. Construction Preliminary Review comments requested specific information on laminating adhesives for products listed in this credit.
high efficiency motors
CS-2009 EAc3:Enhanced Commissioningposted by Afonso Cardoso on
I would like to know if high efficiency motor's verification is part of fundamental commissioning or even enhanced commissioning? If don't, where does it fit? Which credit?
Specialty coatings: Dry erase paint
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Tiffany Moore on
I am evaluating a non-flat coating used to "paint" on a dry erase surface for a training room.
Administrative Wing of Industrial Facility
NC-2009 IEQp1:Minimum IAQ Performanceposted by Lorena Moscoso on
Dear all: There is an administrative wing of an industrial facility and my questions are: 1.