NC-2009 IDc1:Innovation in Designposted by Patricia Missawa on
We intend to implement in our project an educational outreach program to engage the public through periodic events covering green building topics. However, it is not clear how many events they must
non potable water
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Emmanuel Pauwels on
Part of the water for the WCs will be with non-potable water. How do we fill that out in the online leed template?
FSC Certified Products - Documentation?
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Simon Sue on
In some of our current EB:O&M projects we have considered pursuing the MRc1 and MRc3 purchasing credits, claiming credit for FSC certified materials.
Data center consumption and the EAp2 - Case 2 – Option 1 Labs
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Carolina Vergnano on
We are trying to certify a laboratory in Brazil, and we are using the USGBC Calculator and the LABS21.
VOCs of materials Defining the Building Envelope
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Andrew Gil on
I've understood the LEED EQc4.1-4.3 requirements, including the reference standards, and have pursued LEED credits for these numerous times over the past 10 years, but have more recently have had p
Completing EAp3 Form Without Equipment Information
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Tony Schafer on
I am having trouble completing the EAp3 form. Since there won't be any cooling equipment installed as part of this C&S project, there is nothing to fill out in table L-2.
Completing WEp1 Form Without Fixtures Specified
CS-2009 WEp1:Water Use Reductionposted by Tony Schafer on
I am having trouble completing the WEp1 form. Since there won't be any fixtures installed as part of this C&S project, there is no fixture schedule to upload.
IEQp1 ASHRAE Section 4 through 7
CI-2009 IEQp1:Minimum IAQ Performanceposted by Diana Hill on
We are working on a office interior design project.
Tenant Submetering connected to BMS?
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Marco Abdallah on
We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.
Pond use outside LEED boundary
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Brian Wolfe on
Is it acceptable to utilize an existing detention pond that is outside the proposed LEED boundary? The stormwater runoff will be piped under the existing road to the pond.