Off-street parking provided is less than minimum required spaces for EV-ready.
NC-v4.1 LTc8:Electric Vehiclesposted by Erica Downs on
Our project only has 5 parking spaces (all off street), and these are for employees only (FTE = 6), including one HC space.
No parking for the project
CI-v4 LTc5:Reduced parking footprintposted by Ricardo Sá on
I understand that LEED v4 CI specifically states that "if there is existing parking associated with the project, it must comply with the requirements of the credit and show a percentage reduction b
Waste performance yields a score of zero points in ARC
EBOM-v4.1 MRp3:Waste Performanceposted by jimmy Adames on
Hi, Our building is a very automated distribution center for an apparel company. Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, a
One-time air testing: how to enter readings in the ARC platform
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by jimmy Adames on
Greetings, I have a few questions regarding this credit.
Reused dishwashers
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Rachael McGinley on
HI, the new version of the credit states that dishwashers that are reused do not need to comply with the credit requirements.
How outdoor water is calculated for green walls (vertical vegetations)?
NC-v4 WEp1:Outdoor water use reductionposted by Leo LeQuoc on
Our team is working with a new construction project where design team wants to apply green walls (vertical vegetations) outside the building facade.
How outdoor water is calculated for green walls (vertical vegetations)?
NC-v4 WEp2:Indoor water use reductionposted by Leo LeQuoc on
Our team is working with a new construction project where design team wants to apply green walls (vertical vegetations) outside the building facade.
Integrative Process Facilitator
NC-v4.1 IPc1:Integrative Processposted by Edward Reifenstein on
The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results, u
Minimum OA Options
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Courtney Mayes on
Hello, I have a site that has a shared OAD for two units. The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage. Even with reduced C