Required Signatory SSc5.2-1. Owner/Agent

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Aldo Pazo  on 

Hello everyone!! Could anyone explain what's required in point Upload SSc5.2-RS1?

1
Mon Nov 26, 2012, 3:12 pm

DES -option2: virtual rate

CS-2009 EAp2:Minimum Energy Performance
posted by  Johannes Gellrich  on 

Modeling a DES system after Option 2, we got the energy consumption and prices from the DES.

1
Thu Oct 18, 2012, 2:48 pm

outdoor air rate for kitchens

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Adam Targowski  on 

I would like to ask if there's any requirement regarding outdoor air suplly to a kitchen located in an office area? In ASHRAE 62.1-2007 Table 6-1 a kitchen is not mentioned.

1
Fri Dec 21, 2012, 7:57 pm

SHGC vs U-factor

CS-2009 EAc1:Optimize Energy Performance
posted by  Alex AC  on 

Hi everybody! I´m looking at several glass options for a building project and I want to make sure I pick the most cost-effective and energy efficient options available to me.

1
Mon Oct 8, 2012, 2:42 pm

LEED paperwork for EAp2: Seciton 1.2 - Space Summary

NC-2009 EAp2:Minimum Energy Performance
posted by  Doug Cooper  on 

Does the LEED online form want me to list each space room by room, or are a few overall general space types okay?

1
Mon Oct 8, 2012, 1:54 pm

Ceiling credit

CI-2009 IDc1:Innovation in Design
posted by  Tarek   on 

now we are working on project Commercial interior in Egypt ,As you know that there is no credit related to ceiling , 80% of building was used the false ceiling and this ceiling was Meets CA Dept.

1
Sat Nov 24, 2012, 3:12 am

CX EBOM EAc2.1

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Katherine Phelps  on 

Looking for a Building commissioning service provider in Southern Massachusetts.

1
Wed Oct 10, 2012, 9:09 pm

Contract service use of equipment

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Kay Sieck  on 

Do I need to get a list of the powered equipment used by our contract service that is used on site for landscape management such as lawn mowers and leaf blowers?

1
Sun Oct 7, 2012, 6:17 pm

Building recessed into hill/mountain

NC-2009 EAc1:Optimize Energy Performance
posted by  Anoop Vijay  on 

Hi, I have a query related to baseline modeling for a hotel project in oman. This hotel is built on a hillside with the building recessed into the hill completely on one side.

1
Mon Oct 8, 2012, 2:18 pm

SS3, No LEED approved pesticides available here

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Ruba Al-Foraih  on 

I am working on certifying an existing building in a country where non the pesticides approved by LEED are available.

1
Sun Oct 7, 2012, 6:44 pm