NC-2009 EAp2:Minimum Energy Performanceposted by Eric Elizondo on
EAp2- Option 2 Prescriptive Method The current project consists of an existing building that is being renovated along with a new addition to the building.
Shampoo Bowls
Schools-2009 WEc3:Water Use Reductionposted by Ara Massey on
I am working on a vocational high school that has shampoo bowls in the cosmetology classroom. Do these fixtures need to be included in WEc3 and if so as what type of fixture? Thanks!
For Assemblies - what is the location of extraction?
NC-2009 MRc5:Regional Materialsposted by Melissa Wrolstad on
My client has a chair which was manufactured within 500 miles of the project site. The chair is composed of foam (5%), plastic (2%), wood (13%) and steel (80%) by weight.
Option 1 Zoning for a CI- Facility with out of scope areas withi
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Saju Varghese on
Good afternoon. We are currently submitting templates for a University facility.
Formaldehyde Emissions in Plywood Cabinets
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Andy Kallam on
I am currently considering submitting a plywood product for cabinetry that does contain Urea Formaldehyde adhesives.
Millwork as a whole vs. each piece
NC-2009 MRc7:Certified Woodposted by Caro Wilbanks on
We have been denied the MR7 point on a couple of jobs becuase of the millwork documentation.
Bonus point for the Regional Priority Credits
EBOM-2009 RPc1:Regional Priorityposted by Sundararaj Subburaman on
We browsed the USGBC website for Regional Priority Credits outside US in the following link: www.usgbc.org/DisplayPage.aspx?CMSPageID=2435 It is mentioned that earning up to four of the six credit
custom-made refrigerator for EBOM project
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Jorng-ren Chern on
I am working on EBOM for an old office building which includes an employee cafeteria.
1 Additional Bonus Point for earning all 4 RPCs
CI-2009 RPc1:Regional Priorityposted by Nandana Kumar on
Hi, I wanted to understand if it is possible to earn 1 additional bonus points, if the project has earned all 4 points under the RPCs. or is the interpretation of earning only a maximum 4 RPCs
scope of materials
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Adam Targowski on
I would like to clarify what should be included in the calculations for this credit.