Forum quick links
To meter or not to meter
CI-2009 EAc3:Measurement and Verificationposted by Rudolph Carneiro on
I have a store (case 1) with a small 60 ton chiller, 2 AHU's, lighting, and plug loads. If HVAC, plug loads, and lighting can be measured on one meter, how many meters do I need?
Energy Use from EAp2 / EAc1
NC-2009 EAc6:Green powerposted by Michele Helou on
We have already had our EAp2/EAc1 energy model credits reviewed and approved. In an effort to achieve a higher LEED rating, the owner has opted to purchase REC's.
Flow rate for Kitchen Sink
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by ABHIJIT PISAL on
I just want to understand at what pressure is flow rate of kitchen sink (2.2 GPM) defined
Exemptions to ASHRAE 90.1 - 2010
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Fiorelli on
Hello all, We're working on a project that has an area that is includeded under exemptions to ASHRAE 90.1-2010 Interior Lighting Requirements.
New Construction
NC-2009 PIf1:Minimum Program Requirementsposted by Hugh Hagues on
I have a building opened in 1989. Subsequent extension were constructed in 2003. Can I classify the extensions as "new construction?"
Appendix G - Baseline Building Rotations
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi All, Are baseline building rotations necessary for a new building that is connected to an existing building. Note that the new building is being modeled as a stand alone.
Natural and mechanically ventilated space: hybrid LEED model
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jeremy Eddy on
> I am trying to model a hybrid system in Carrier HAP. We have a VRF system that utilizes dedicated outdoor air at a constant supply CFM as well as standard indoor recirculation units.
Call-a-Ride as compliant public transport
Schools-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Todd Bundren on
The local metro transit service (public transit services) in my project’s area offers a Call-A-Ride curb-to-curb service for the general public and persons with disabilities.
Clarification of credit intent and documentation
Pilot-Credits SSpc55:Bird collision deterrenceposted by Joseph Ford, AIA on
I am having difficulty determining if my project can comply with this credit.
Kitchen Faucet
CS-2009 WEp1:Water Use Reductionposted by ABHIJIT PISAL on
The building what we are certifying does not have kitchens or canteen. It only has pantry/breakout areas wherein people have snacks and beverages.