how i need to model that to comply with model actual equipment a

CS-2009 EAp2:Minimum Energy Performance
posted by  Ron Dean  on 

There is a fan system that will supply outdoor air for the building, This system is a big injection fan that will supply air to all zones that is completed designed and all the zones that are not c

1
Mon Dec 3, 2012, 5:25 pm

LEED Compliant Epoxy Floor Coating?

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Rebekah Burke  on 

I see this topic somewhat proposed, but I haven't been able to really see an answer.

1
Sat Dec 1, 2012, 12:13 am

Useable Square Footage

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Joel Register  on 

I am trying to determine what is considered "useable square footage" of a floor plate. The credits refers to both total floor plate and useable square footage. Any ideas?

1
Wed Jan 2, 2013, 3:07 pm
1
Fri Nov 30, 2012, 3:47 pm

LEED CS vs. LEED CI

CI-2009 MRc4:Recycled Content
posted by  Mathilda Jonsson  on 

Hi all I'm working on a LEED CS project and a LEED CI project wich will be located in the LEED CS project.

1
Fri Dec 14, 2012, 7:39 pm

Project Site Boundary Includes Existing Building

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Andrew Oxley  on 

Our project site includes the LEED project (new building) and a separate (not connected) existing building that will remain.

1
Thu Dec 6, 2012, 3:03 pm

Paving as part of Construction Costs

NC-2009 MRc4:Recycled Content
posted by  Mariah Grife  on 

The new LEED language has clarified that 32.10.00 Paving should be included in the construction costs. However, the only paving that will occur on my project's contract will be in-street paving p

1
Fri Nov 30, 2012, 3:23 am

P1 form 4: Date team expects to make first LEED submittal

NC-2009 PIf4:Schedule and Overview Documents
posted by  John Eden  on 

If we are doing split review should this date be for the Design Review?

1
Mon Dec 3, 2012, 8:29 pm

Only LEED CS inside proj. boundary

ND-v2009 GIBc1:Certified green buildings
posted by  Karyn Rodrigues  on 

Considering that we have 6 LEED CS-certified buildings inside project boundary.

1
Mon Dec 3, 2012, 3:15 am

combine rail and bus for exemplary performance

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Courtney Royal  on 

hi, i was wondering if its possible to use a combination of subway and bus lines to achieve an ID EP credit. I think we've done that in the past, but I can't remember! Thanks!

1