Forum quick links
Project is in itself a public transportation system
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Valentin Grimaud on
Hi, The project I'm currently looking at is a subway line, with the possible certification of each station independently. Could we consider that each station fills the requirements for this projec
How to model the ventilation system for baseline model.
NC-2009 EAp2:Minimum Energy Performanceposted by La Verne Ramir Certeza on
Hello, I would just like to ask regarding how I should model the ventilation system of my baseline model. My project is a hotel building which uses chilled water as its main cooling medium.
In-house CxA with In-house Design, MEP, and Construction Teams
NC-2009 EAc3:Enhanced Commissioningposted by Simon Sue on
We're under a scenario that a developer (owner) has in-house design team, in-house MEP team, and in-house construction team working on a single project.
MRc4 - Alum. Frame by Frameworks
CI-2009 MRc4:Recycled Contentposted by Judy Chin on
I rec'd product data for recycled content on the alum. frame stating material composed of 25% post-consumer primary, and 50% post-industrial scrap.
Renovation (occupancy never stopped) / 24-hour operation
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Alexandre Schinazi on
Hello, I am working on a project in Brazil with specific conditions that have brought up 2 questions concerning this credit.
IEQp1: Exhaust fans for public/private lavatories, kitchen,
NC-2009 IEQp1:Minimum IAQ Performanceposted by RICHARD CUEBAS on
IEQp1: Exhaust fans for public and private lavatories, kitchen, cafeteria and multiuse court Our project is a new school. The Design Final Review denied IEQp1 with two comments.
FSC vs SFI
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Kay Sieck on
Why does LEED not recognize SFI products? We purchase products with that label such as our hanging folders and file folders. Does it count as and FSC product? Thanks for the help
Contractor specification template software or forms
NC-2009 MRc2:Construction Waste Managementposted by John Covello on
This is more of a general question. Does anyone have experience with Green Building Specifications for Sustainable Development software from UDA (uniteddesign.com)?
SSc1 path 7,8
CI-2009 SSc1:Site Selectionposted by Mark Taake on
Is it possible to achieve only the points for path 8, without achieving path 7? Under path 8, the wording states that the 2 points are in addition to path 7. So is path 7 a pre-requisite for 8?
thermal comfort calculations for a shopping mall
CS-2009 IEQc7:Thermal Comfort—Designposted by Adam Targowski on
How should I conduct PMV and PPD calculations for a shopping mall?