NC-2009 EAp2:Minimum Energy Performance
posted by  Graham Langton  on 

How should a future process be taken into account?

1
Thu Dec 6, 2012, 8:49 pm
1
Fri Dec 7, 2012, 4:07 pm

Mixed use: Production; Shipping/Receiving; R/D; Office Space

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Aaron Nelson  on 

The building has four space types and 20 AHUs. The building lacks any integrated controls, so each AHU operates independent of the other.

1
Tue Dec 11, 2012, 6:47 pm

Ashrae 62.1 vetilation rate - Constant OA with VAV system

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Bradford Crosby  on 

We have a constant volume air fan feeding many floors. It feeds the mechanical space using it as a plenum. At the floor level there is a Supply fan serving the VAV and Fan boxes.

1
Tue Dec 11, 2012, 6:54 pm

P1 Form 4 Core and Shell Scope Upload L-6

NC-2009 PIf4:Schedule and Overview Documents
posted by  Phil Meyer  on 

I have a question regarding appropriate document types for Upload L-6. The developer intends to achieve LEED credits for the building based on tenant cooperation/compliance.

1
Mon Dec 17, 2012, 7:28 pm

Public Plaza nearby the project site - LEED ND

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Gaston Viau  on 

Our project is located on a LEED ND. When designing the neighborhood, local zoning requirements were committed by a Development Plan which included open spaces all around the neighborhood.

1
Fri Dec 7, 2012, 4:11 pm

Building Footprint- Underground Wine Caves

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Kevin Gilleran  on 

We are working on a winery project with an above ground winery building and connected underground wine storage caves.

1
Fri Dec 14, 2012, 6:02 pm

population diversity factor

EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilation
posted by  Katherine Ann Resurreccion  on 

Our project is an office building with 300 regular occupants. One zone/occupancy category of the building is a multi-purpose room.

1
Tue Dec 18, 2012, 10:48 pm

Certifying floor area

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Romain Bourcier  on 

Dear all, My client has an existing mixed-use building. There are stores on the ground floor and offices on the upper floors. The refurbishment works only apply to the offices areas. Do I have to

1
Tue Dec 11, 2012, 4:48 pm

Natural Ventilation Interpretation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Nandana Kumar  on 

Hi, Can anyone kindly interpret the sentence below from ASHRAE 62.1 2007 'All naturally ventilated spaces must be within 25' of (and permanently open to) operable wall or roof openings to the outdo

1
Fri Dec 21, 2012, 5:20 pm