Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Default Budget %

CI-2009 MRc5:Regional Materials
posted by  Nate Maniktala  on 

What is the 'Default Budget Percent'? In NC, it is as stated as 45% but CI does not mention this percentage specifically.

1
Fri Dec 7, 2012, 5:55 pm

Are glulam beams included in credit EQ4.4

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Joanne Sawatzky  on 

We are wondering if glulam beams need to contain no added urea formaldehyde? thanks curtis

1
Fri Dec 7, 2012, 11:07 pm

LEED-CS v2.0

NC-2009 PIf1:Minimum Program Requirements
posted by  Jodie Clarke  on 

I have a project that registered using LEED-CS v2.0 in 2007.

1
Mon Dec 10, 2012, 2:13 pm

submit to leed-online compliance

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ron Dean  on 

Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I

1
Mon Dec 10, 2012, 4:30 pm

GCBI project review cost

NC-2009 PIf2:Project Summary Details
posted by  Michael Kros  on 

I submitted a project for D&C review. The project is a 25,000 SF addition to an already LEED certified building of 60,000 SF.

1
Mon Dec 10, 2012, 10:10 pm

Reuse of Light Fixtures and Mechanical Vents

CI-2009 IDc1:Innovation in Design
posted by  Caro Wilbanks  on 

I am wondering if the reuse of light fixtures and mechanical vents has ever been used towards an ID credit. I understand that these divisions are not counted towards any of the MR credits.

1
Fri Dec 14, 2012, 7:56 pm

Baseline System Selection - larger heated space - smaller cooled

NC-2009 EAp2:Minimum Energy Performance
posted by  Don Carsto  on 

Our case involves 16,000 sqft of cooled and heated space and 90,000 sqft of heated-only space. The two spaces happen to be separated by a 4-hour fire wall.

1
Tue Dec 11, 2012, 2:46 pm

ASHRAE 90.1 appendix G - VAV modelisation in baseline system 7

NC-2009 EAc1:Optimize Energy Performance
posted by  Julien Daclin  on 

Hi, I have a question about the interpretation of section G3.1.3.13 (VAV minimum flow setpoints).

1
Wed Dec 12, 2012, 3:36 pm

posts on original LEED-HC forum

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Tristan Roberts  on 

For everyone's reference, there are a number of forum posts that were made to LEEDuser's general LE

1
Sun Nov 10, 2013, 10:09 am

posts on old forum

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Tristan Roberts  on 

Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this IEQc8.2 question was posted. I am reposting the Q&A here for convenience:

0