Forum quick links
active control for private offices
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mark Taake on
I'm beginning to think that in many cases the private office active control requirement can be made to work for a VAV system only if each office has a separate motorized damper in the supply duct s
HVAC System Type for heating only warehouse
CS-2009 EAc1:Optimize Energy Performanceposted by Matt Short on
After reading through the forum I have not found a response that specifically addresses a CS building who's future tenant finishout of office and warehouse space is yet to be designed but has the f
Number of IAQ Sampling Locations in Apartment Building?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Bill Kilpatrick on
I would appreciate advice on the number of sampling locations needed for LEED Testing per IEQ Credit 3.2 Option 2 in mid-rise Apartment buildings. We follow the sampling rules for commercial build
Communal cycle spaces
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Eszter Gulacsy on
We are currently working on a LEED-CI project, in which there is no cycle storage planned / available within the project area, however, there is ample cycle racks near to the site.
Table IEQc1-2 Outdoor Air Ventilation Rate
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Thomas Hellmann on
According to IEQc1, I am to complete table IEQc1-2 for all systems where 20% or more of the design supply airflow serves non-densely-occupied spaces.
LEED Pilot Credit 13-comment
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Alice Sung on
I appreciated Michael Smithing's clarificationof the defintion of a bicycle "network, " as inclusive of : " residential streets designed for a target speed of 25 mph (40 km/hr) or slower and comme
Fair price for off-site land conservation credits
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Chris Draper on
Does anyone know the basic market price/acre or price/credit for securing contracts on off-site land that meets the SSc5 requirements?
Project without any HVAC change
NC-2009 PIf4:Schedule and Overview Documentsposted by Diana Hill on
We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system.
LEED Online 3.0 form
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Noriko Nagazumi on
The IEQc7.2 Cooling Mode table asks for the Design Operative Temperature, Maximum Design Humidity and Design Air Speed for the four seasons (Spring, Summer, Fall, Winter).
Hand drier
CI-2009 MRc4:Recycled Contentposted by soha yamani on
hand drier installed in toilets : should it be included in materials ? if yes under which CSI division it is mentioned