Forum quick links
Wall Finishes
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Laurie Hammack on
We have a project that is retaining most of the interior walls, but the walls are to receive new wall covering materials.
Eligibility
NC-2009 PIf1:Minimum Program Requirementsposted by PAWAN DAHIWAL on
I want to get LEED-EBOM certification for my book store (18,000 sq.ft) located on 3rd floor of total 12 floor building. can i eligible to get certification?
System type for Retail space
NC-2009 EAp2:Minimum Energy Performanceposted by Erika Duran on
I'm modeling a residential building with water to air heat pumps in all apartments.
What is the LEED recommended teperatue for a
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Mahbuba Khan AIA, LEED AP BD+C on
I am working on a mechanically ventilated manufacturing building in Bangladesh. What is the maximum acceptable temperature for this kind of building?
Calculating Views for Healthcare Interiors Projects?
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Kathy Wislocky on
Has anyone contemplated an alternate compliance path for calculating views for a healthcare interiors project?
Document review
Schools-2009 EAc3:Enhanced Commissioningposted by Adam Rustige on
Is reviewing I&O manuals and as-built drawings a requirement for enhanced commissioning? Thanks
Missing requirement on Pilot Form?
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Brian Leet on
When I go to the current version of the pilot credit form at http://www.usgbc.org/ShowFile.aspx?DocumentID=10106 there is no actual Material Source Disclosure language within the credit itself.
Proposed Vs Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
My proposed case VAV does not have parallel fan power boxes.
LPB of Subway Station
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Marcio Alberto Casado Pereira on
Dear all, This building has a roof structure that goes beyond the property line in order to shade the sidewalk next to it. It's a public building, that's why.
Interior non-load bearing de-mountable partitions
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Taimor Farid on
Hi All Are interior partitions (non load-bearing, demountable) considered fixtures/ fit-out materials? I.E. are they exluded from this credit?