Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Wall Finishes

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Laurie Hammack  on 

We have a project that is retaining most of the interior walls, but the walls are to receive new wall covering materials.

1
Wed Jan 9, 2013, 5:26 pm

Eligibility

NC-2009 PIf1:Minimum Program Requirements
posted by  PAWAN DAHIWAL  on 

I want to get LEED-EBOM certification for my book store (18,000 sq.ft) located on 3rd floor of total 12 floor building. can i eligible to get certification?

1
Thu Dec 27, 2012, 2:23 pm

System type for Retail space

NC-2009 EAp2:Minimum Energy Performance
posted by  Erika Duran  on 

I'm modeling a residential building with water to air heat pumps in all apartments.

1
Thu Dec 27, 2012, 9:39 pm

What is the LEED recommended teperatue for a

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Mahbuba Khan AIA, LEED AP BD+C  on 

I am working on a mechanically ventilated manufacturing building in Bangladesh. What is the maximum acceptable temperature for this kind of building?

1
Mon Dec 31, 2012, 3:56 pm

Calculating Views for Healthcare Interiors Projects?

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Kathy Wislocky  on 

Has anyone contemplated an alternate compliance path for calculating views for a healthcare interiors project?

1
Wed Jan 2, 2013, 3:37 pm

Document review

Schools-2009 EAc3:Enhanced Commissioning
posted by  Adam Rustige  on 

Is reviewing I&O manuals and as-built drawings a requirement for enhanced commissioning? Thanks

1
Mon Jan 7, 2013, 3:12 pm

Missing requirement on Pilot Form?

Pilot-Credits MRpc53:Responsible sourcing of raw materials
posted by  Brian Leet  on 

When I go to the current version of the pilot credit form at http://www.usgbc.org/ShowFile.aspx?DocumentID=10106 there is no actual Material Source Disclosure language within the credit itself.

0

Proposed Vs Baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

My proposed case VAV does not have parallel fan power boxes.

1
Wed Jan 2, 2013, 3:48 pm

LPB of Subway Station

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Marcio Alberto Casado Pereira  on 

Dear all, This building has a roof structure that goes beyond the property line in order to shade the sidewalk next to it. It's a public building, that's why.

1
Mon Jan 21, 2013, 3:35 pm

Interior non-load bearing de-mountable partitions

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Taimor Farid  on 

Hi All Are interior partitions (non load-bearing, demountable) considered fixtures/ fit-out materials? I.E. are they exluded from this credit?

1
Sun Jan 6, 2013, 7:48 am