definition of greenfield for commercial interiors
CI-2009 SSc2:Development Density and Community Connectivityposted by Ken Dooley on
Hi all, how can a fit-out that is to be certiifed by commercial interiors be a "greenfield development" ? Surely once the core and shell project is completed, the fit-out is on a previously develop
Alternative Compliance Path Case 1: Lease Document
CI-2009 EAc3:Measurement and Verificationposted by Carolina Acevedo on
Is there an alternative compliance approach to this credit? My project falls under Case 1 (less than 75% of the project space), but my client owns the floors hence the lack of a lease agreement.
Undefined Outdoor Spaces
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Luis Miguel Diazgranados on
Greetings Everyone I'm working on a office project with outdoor spaces within the LEED Boundary. The project's construction phase is almost finished.
Material-Efficient Framing based on LEED-Homes?
NC-2009 IDc1:Innovation in Designposted by Heather DeGrella on
Has anyone tried an ID point for NC, based on the Material-Efficient Framing credit in LEED for Homes?
Determining Baseline for Mixed Use
NC-2009 EAp2:Minimum Energy Performanceposted by Jason Biondi on
Hi all, thanks for the forum. The building is 8 stories, 3 flrs office, 3 floors parking, 1 retail, 1 resturaunt. Is it accepabable to use the 5 story building baseline schedule if the parking gara
Water deduct meters acceptable as submeter?
EBOM-2009 WEc1:Water Performance Measurementposted by Ryan Nelson on
Could a water deduct meter be used as a working submeter assuming it properly segregates systems such as the cooling tower or irrigation?
LEED Boundary/Gross Floor Area for LEED-CI project
NC-2009 PIf2:Project Summary Detailsposted by Silvia Ruiz on
1. In calculating the gross floor area of an office located in a building with curtain walls, would the measurement be taken from the exterior face of the curtain wall?
Completing PIF1 when you have an exception to providing meters
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Susan Di Giulio on
We are working on a municipal water processing plant.
option 3 requirements
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Adam Targowski on
Are there any requirements regarding the time of the day when the daylight measurements have to be taken?
Owner's Policy, or Cleaning Contractor's Policy?
EBOM-2009 IEQp3:Green Cleaning Policyposted by Margaret McColl on
Hello, I am working on a project that is owned an occupied by a single company that uses a cleaning contractor. Does the Green Cleaning Policy have to be developed and implemented by the Owner?