CS-2009 WEc1:Water Efficient Landscapingposted by CRolim Engenharia on
Hi! In my project, certain areas just has trees and ground cover. For these areas , i will use the landscape factors for mixed trees, shrubs and groundcovers? Thank you!
Owner Manages or Owner Owns -- on a Leased floor
NC-2009 PIf3:Occupant and Usage Dataposted by Andy Record on
We have leased a whole floor of a multi-tennant building of general office space, (CI 2009).
LEED Silver
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Michael Engen on
Are there any LEED credits for exterior paint/coatings? We are building a retail center (shell) & we have an exterior high performance exterior coating.
One paint / two applications / two standards?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Nereyda Rodriguez on
We have a waterborne acrylic enamel that is used in two applications in our project. When applied to steel joists, conduit, etc.
"Other" Sealants and Sealant Primers
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michelle Rosenberger on
What is the definition of the "Other" category in Rule 1168? I have a BASF product identified as a non-porous sealant primer with 584 g/l that they say complies with EQ4.1 on their letterhead.
heat recovery system for base case ?
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
We are modelling our CS case in Sao Paulo (Climate 2A).
embodied energy
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Jody Solell on
Most if not all construction sites have a generator running to power the site. On new SF home construction the amount of gasoline used during the construction phase is about 100-150 gallons.
Unmet Loads Hours
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello, i have a question about Unmet Loads Hours. This value is (Time Setpoint Not Met During Occupied Heating + Time Setpoint Not Met During Occupied Cooling) or (Time Setpoint Not Met During Hea
Tenant submetering
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Dina Ammar on
The developer's CS project consists of two large leasable spaces. One wing to be used for a department store, the other one to be used as furnished apartments.
Recycling of the factory
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Jatuwat Varodompun on
We planned to apply LEED for a factory which has a recycle yard. The yard is openned and will be used to sort the wast for recycling without any clear boundary of waste types.