Forum quick links
survey - regular building occupants or FTE?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Lothar Lustich on
We need a hint for using the correct occupants.
LEED NC project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jatuwat Varodompun on
We purchased an abandon building which will be renovated for both envelope, Electric, and HVAC. The problem is we will own only have of the building.
Surface brightness requirement
Pilot-Credits EQpc22:Interior lighting - qualityposted by Fatima Plaza on
We are applying for this pilot credit in a building which facade consist of a double skin facade, the exterior layer is opaque with windows (existing facade of the building before project renovatio
Kitchen Food Service Equipment
Schools-2009 EAc4:Enhanced Refrigerant Managementposted by Hamilton Cort on
I just went through calculating walk-in Cooler and Freezer condensers for our school kitchen.
Turpentine - VOC?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Marcio Alberto Casado Pereira on
Is there a category for paint diluent?
Minimum Energy Efficiency in Historic Buildings
ND-v2009 GIBc2:Building energy efficiencyposted by Anne Tambling on
We have just started on a residential development in a historic district with the conversion of an existing historic building with landmark status into condominiums and the construction of 15 new h
Exemp. Perf. Design Credits Submitted During Construction Review
NC-2009 IDc1:Innovation in Designposted by Ralph Bicknese on
Has anyone successfully submitted already reviewed (and anticipated) Design Credits that achieved exemplary performance status during the Construction Review for an innovation point?
Chiller Efficiency: With Errata?
NC-2009 EAp2:Minimum Energy Performanceposted by Johannes Hopf on
Hello everyone, The reference guide refers to ASHRAE 90.1-2007 with errata without addenda. Now the Minimum Chiller Efficiency for Water Chilling Packages changed. Original Table 6.8.1C: e.g.
illumination metering with a photovoltaic system?
NC-2009 EAc5:Measurement and Verificationposted by Tatiana Machado on
A project illumination system is controlled by a photovoltaic system.
Can we switch methods to achieve SSc5 after initial review?
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Ryan Nelson on
We recently recieved our project review for a property. Initially, we attempted to claim a retention pond as an on-site protected land.