Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tridimensional LPB??

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Marcio Alberto Casado Pereira  on 

Hi all, We are workign on this subway station and it has ramps that cgoes across the streets.

1
Mon Jan 28, 2013, 5:04 pm

Post Occupancy Survey for LEED CS

NC-2009 IDc1:Innovation in Design
posted by  Phil Meyer  on 

Has anyone heard of doing a Post-Occupancy Survey/Evaluation, in regards to IEQ, as an ID for LEED CS?

1
Tue Jan 22, 2013, 5:30 pm

Core and Shell Renovation/Addition Parking not in Scope

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Ed Clark  on 

We are looking at a Core and Shell Renovation/Addition. We will pursue 2009 C&S and EBOM afterwards.

1
Thu Mar 21, 2013, 2:35 pm

Is data being gathered and used?

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Bill Swanson  on 

We commit to allowing USGBC to have access to our energy and water meter data from the Utilities. Does USGBC follow up and collect this building data for all v2009 projects?

1
Thu Feb 25, 2016, 7:12 pm

OPR Never Produced

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Ed Clark  on 

I was added to the project after construction due to staffing changes. An OPR was never produced. The design meets and exceeds the owner's goals and commissioning has been completed.

1
Wed Jan 23, 2013, 4:56 pm

"Less of Water" Term

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Abdulrahman Sherazy  on 

What does "less of water" mean? We have powder adhesive material for ceramic tiles. We sent it to the lab to determine the VOC content.

1
Fri Feb 1, 2013, 1:30 am

EAC1 Existing Building Renovation Baseline Rotations Required?

Schools-2009 EAc1:Optimize Energy Performance
posted by  Matt Humphreys  on 

Is it required in the EAC1 energy model to perform the baseline building rotations of 90, 180 and 270º for an existing building that is being renovated provided the building footprint and exterior

1
Thu Jan 24, 2013, 8:41 pm

Non-contiguous LEED boundary

NC-2009 PIf2:Project Summary Details
posted by  Todd Bundren  on 

I am working on a school renovation / addition project.

1
Thu Jan 24, 2013, 10:29 pm

Minimum Recycling Area for residential building

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  SUNG SU KIM  on 

Hi guys. We are pursuing LEED v2.2. Our project have five separate residential building. We will provide recycling area where each building entrance.

1
Fri Feb 1, 2013, 12:24 am

Mandatory provision 6.4.3.2 Setpoint Overlap Restriction

CS-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

Mandatory provision 6.4.3.2 Setpoint Overlap Restriction When heating and cooling to a zone is controlled by separate thermostatic controls shall heating setpoint exceed cooling setpoint. In our C&

1
Thu Jan 24, 2013, 8:18 pm