Forum quick links
VOC as an emission (%) vs Volume (g/l) - EU vs. US
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Timothy Nabholz on
I have seen that this topic has been discussed quite a bit previously, however I haven't seen any consensus on the subject.
LEED Boundary with a NON Certified Building within it?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sonia M. Miranda Palacios on
Hi all. I have a LEED Certifiable Building (C&S V.3) within a site, that will also have a NON certified building within it.
Multi-unit residential buildings
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by MARCIO OROFINO on
According to the reference guide, there are: CASE 1 OPTION 1, where smoking is prohibited, CASE 1 OPTION 2 (Non-residential projects), where smoking is prohibited except in designated areas, AND C
no space for 10 feet long walk-off mats in cafes
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Adam Targowski on
Entryway walk-off systems at least 10 feet long will be installed in all regularly used entrances to the shopping mall we are working on.
tenant lease language
CS-2009 IEQp1:Minimum IAQ Performanceposted by Adam Targowski on
What has to be included in the tenant lease for the shopping mall spaces?
Compliance with ASHRAE 90.1 conflict with local norms
NC-2009 EAp2:Minimum Energy Performanceposted by Ward Miller on
In Bulgaria we have a project, which if using the Building Area Method of ASHRAE 90.1-2007 meets lighting requirements; however, using the Space by Space Method requires adjustments to be made to
EAp2 - Playground Field, Internal and External Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Hi, On a Arena Sports stadium we are considering the "Building method Area" for the Interior Lighting.
Acoustic Ceiling Tiles
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Nanechka Pagan on
Does Acoustic Ceiling Tiles (composition: Mineral Wool) can be used as material to comply with this credit.
Existing Parking - Reuse Structural Slab
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nanechka Pagan on
The project that I am currently working have an existing structural floor slab (previously used as a parking lot; doesn't not have roof/walls), the current design intent is to maintain more than 6
How to calculate / consider Elevators Energy consumption?
NC-2009 EAc1:Optimize Energy Performanceposted by Marcio Alberto Casado Pereira on
Is there any reference available to learn how to calculate and /or consider elevators energy consumption for both baseline and proposed models?