Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Adequate measurement equipment and procedures

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  CAIO DE MELO  on 

We are working on an office building with fan-coils units conditioning office spaces on typical floors and several multi-split ceiling cassette units conditioning technical occupied areas (maintena

1
Wed Jan 30, 2013, 2:24 pm

IAQ Procedure contaminant testing - costs and concerns

Pilot-Credits EQpc68:Indoor air quality procedure
posted by  Lyle Axelarris  on 

This comment is also posted in the EBOM 2009 - EQpc68 forum: Does anyone have any experience with the GC/MS contaminant testing required by the IAQ Procedure?

0

manipulation of the form

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Craig Flandermeyer  on 

From my experience, the add/delete row on the template only works on the last row. Any magic for changing/deleting other rows without having to re enter the entire form?

1
Thu Feb 14, 2013, 9:47 pm

2-year 24-hour Design Storm in Indonesia

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Ivan Priatman  on 

Hi, I'm currently doing a project in Indonesia and having trouble to find the 2-year 24-hour design storm data.

1
Wed Jan 30, 2013, 12:12 pm

Approved Equivalent Standard

CI-2009 EAp2:Minimum Energy Performance
posted by  Jos Schild  on 

Projects outside the US may use USGBC approved equivalent standards to show compliance to the Minimum Energy Performance. Is there a list with these standards for Europe and/or The Netherlands?

1
Wed Jan 30, 2013, 3:29 pm

BMPs in series

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Tristan Roberts  on 

I heard a comment from a LEED user that GBCI reviewers do not understand the application of Best Management Practices in series.

1
Wed Jan 30, 2013, 3:27 pm

Are Clerestory Windows considered a roof, or a window?

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Mark Elsensohn  on 

I am working on a Healthcare v2009 project where we are removing and infilling a bunch of clerestory windows.

1
Fri Feb 1, 2013, 10:58 pm

Enclosed Room?

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Carrie Laurendine  on 

Can the "dedicated space" be a space set aside in part of a bigger "back of house" service room (near loading dock)?

1
Wed Jan 30, 2013, 11:30 pm

weather file

NC-2009 EAc1:Optimize Energy Performance
posted by  Sonia Martini  on 

Hi What's the necessary documentation needed when submitting a simulation run with a self-made weather file (based on historical data)? Thanks Sonia

1
Thu Jan 31, 2013, 1:59 pm

Minimum number of equipments to be audited

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  ESD Singapore  on 

Hi all, The project that we are working on would like to go pursue this credit using ASHRAE level 2 commissioning audit path. However, this project has a large quantity of AHUs and FCUs (approx.

1
Fri Feb 1, 2013, 12:51 pm