Contaimination found,but remediation not required per site class

NC-2009 SSc3:Brownfield Redevelopment
posted by  Erin Holdenried  on 

I have a project where some mercury contamination was found, but not enough to require remediation for the intended use as an industrial site. I assume that in order to achieve this credit some so

1
Wed Feb 20, 2013, 5:54 pm

Flush & Flow Fixture Installations

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Alexis Voeltner  on 

If our potential project is currently installing flush & flow fixtures, but wants to start the performance period, is it acceptable to enter the new flush & flow rates as long as they are a

1
Thu Feb 21, 2013, 4:39 pm

Athletic Field included under SSc5.2, but excluded under WEc1?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Lisa Milano  on 

There is an existing athletic field within our project's LEED boundary that we would like to include in our calculation for SSc5.2 in order to earn exemplary performance.

1
Fri Feb 22, 2013, 10:44 pm

Testing Approach

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  J.R. Anderson  on 

I have a middle school slated to be completed this coming summer. It will be in late July. Each classroom has a dedicated ground source heat pump air handling unit.

1
Wed Mar 20, 2013, 11:47 pm

About the "You may get dirty" factor in SSc6

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Jun MA  on 

I've been reading the EB&OM stress test, and felt confused about the "You may get dirty" factor in SSc6.

1
Thu Feb 21, 2013, 2:43 am

Minimum implementation of sanitary fixtures

CS-2009 WEp1:Water Use Reduction
posted by  PAULA HIDALGO  on 

Is there a minimum implementation of sanitary fixtures?

1
Fri Mar 22, 2013, 5:21 am

How to include Parking Ramp Energy Use in Small Bldg?

NC-2009 EAp2:Minimum Energy Performance
posted by  Kevin Flynn  on 

I have just begun working on a project that features a small (under 20,000sf) office building on a large public plaza on top of a below grade parking ramp.

0

the new formaldehyde rule

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Tristan Roberts  on 

IEQc4.4 watchers should check out LEED Interpretation #10250, issued January 1, 2013. It makes what used to be a black and white credit requirement has become more nuanced.

0

misc. accessories & appliances

Schools-2009 MRc4:Recycled Content
posted by  Eri Spaulding  on 

How about misc. items such as fire extinguisher cabinets, interior signage & toilet accessories?

1
Sun Feb 24, 2013, 12:25 am

Achieving EBOM credit as an ID point

NC-2009 IDc1:Innovation in Design
posted by  Barbara McCrary  on 

Ive never tried to achieve an EBOM credit as an ID credit for NC BD+C. Has anyone has success achieving EBOM WEc1?

1
Mon Feb 25, 2013, 4:38 pm