Forum quick links
LEED NC 2009 - EAc5 - M&V
NC-2009 EAc5:Measurement and Verificationposted by Genko Ganev on
Would GBCI accept meter data entry into Energy Star Portfolio Manager for 12 months period as an approved method for M&V for new construction?
ID Credit?
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by John-David Hutchison, LEED AP BD+C, PMP on
Has anyone successfully utilized this EB:OM credit as an ID credit for NC or CI?
Darkrooms LPD Space by Space Method
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We have a darkroom in a facility but Im not sure if it should be classified as active, inactive storage or other type of classification for the space by space method.
How to Determine and Overall M&V Accuracy
NC-2009 EAc5:Measurement and Verificationposted by Margaret McColl on
IPMVP Vol III requires the M&V Plan to include the "expected overall M&V accuracy" (pg 9) and in Section 4.5.9 Option D: Uncertainty it refers to ASHRAE Guideline 14 for guidance.
Do I need to document out of scope HVAC equipment?
CI-2009 EAp2:Minimum Energy Performanceposted by Silvia Ruiz on
Hi, Given that only the portions of the building as covered by the tenant’s scope of work need to comply with ANSI/ASHRAE/IESNA Standard 90.1–2007, do we need to document those that are out of the
Do we need to document out of scope HVAC equipment?
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Silvia Ruiz on
I am working on a project where all of the AHUs, except for one, are provided by the building owner.
Rule 2202 Mobile Source Emission Reduction Credits
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jason Cocek on
I have a project in California that is purchasing Mobile Source Emission Reduction Credits in order to comply with Rule 2202.
Determining R-values for LEED wall assembly
NC-2009 EAp2:Minimum Energy Performanceposted by Todd Bundren on
Is there a standard way the USGBC wants the R-value of a wall assembly to be calculated taking into account the framing factor or thermal bridging that occurs with metal studs?
Residential building
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by CRolim Engenharia on
hi, My project is a residential building.
Earth Sheltered Buildings & Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Josie Plaut on
We have a project that will be 60-70% earth sheltered and Appendix G doesn’t seem to provide guidance on how we might demonstrate the energy savings.