LEED NC 2009 - EAc5 - M&V

NC-2009 EAc5:Measurement and Verification
posted by  Genko Ganev  on 

Would GBCI accept meter data entry into Energy Star Portfolio Manager for 12 months period as an approved method for M&V for new construction?

1
Mon Feb 25, 2013, 8:02 pm

ID Credit?

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  John-David Hutchison, LEED AP BD+C, PMP  on 

Has anyone successfully utilized this EB:OM credit as an ID credit for NC or CI?

1
Mon Feb 25, 2013, 7:41 pm

Darkrooms LPD Space by Space Method

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

We have a darkroom in a facility but Im not sure if it should be classified as active, inactive storage or other type of classification for the space by space method.

1
Tue Feb 26, 2013, 2:47 pm

How to Determine and Overall M&V Accuracy

NC-2009 EAc5:Measurement and Verification
posted by  Margaret McColl  on 

IPMVP Vol III requires the M&V Plan to include the "expected overall M&V accuracy" (pg 9) and in Section 4.5.9 Option D: Uncertainty it refers to ASHRAE Guideline 14 for guidance.

1
Tue Feb 26, 2013, 5:00 pm

Do I need to document out of scope HVAC equipment?

CI-2009 EAp2:Minimum Energy Performance
posted by  Silvia Ruiz  on 

Hi, Given that only the portions of the building as covered by the tenant’s scope of work need to comply with ANSI/ASHRAE/IESNA Standard 90.1–2007, do we need to document those that are out of the

1
Tue Feb 26, 2013, 6:10 pm

Do we need to document out of scope HVAC equipment?

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Silvia Ruiz  on 

I am working on a project where all of the AHUs, except for one, are provided by the building owner.

1
Mon Mar 25, 2013, 10:54 pm

Rule 2202 Mobile Source Emission Reduction Credits

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Jason Cocek  on 

I have a project in California that is purchasing Mobile Source Emission Reduction Credits in order to comply with Rule 2202.

1
Wed Feb 27, 2013, 4:46 pm

Determining R-values for LEED wall assembly

NC-2009 EAp2:Minimum Energy Performance
posted by  Todd Bundren  on 

Is there a standard way the USGBC wants the R-value of a wall assembly to be calculated taking into account the framing factor or thermal bridging that occurs with metal studs?

1
Tue Feb 26, 2013, 9:44 pm

Residential building

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  CRolim Engenharia  on 

hi, My project is a residential building.

1
Wed Feb 27, 2013, 6:33 pm

Earth Sheltered Buildings & Energy Modeling

NC-2009 EAc1:Optimize Energy Performance
posted by  Josie Plaut  on 

We have a project that will be 60-70% earth sheltered and Appendix G doesn’t seem to provide guidance on how we might demonstrate the energy savings.

1