Submittal Exchange and IDc1

NC-2009 IDc1:Innovation in Design
posted by  Keelan Kaiser  on 

For any of you familiar with the Submittal Exchange product, can anyone verify whether it is possible to pull down an IDc1 for this integrated submittal review process?

1
Wed Mar 13, 2013, 8:10 pm

Existing LEED project boundary and new site work

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Susan Robertson  on 

I need some input. I have a project with an existing LEED boundary. The client did some site work - hardscaping and landscaping within the boundary after our project was occupied.

1
Tue Mar 12, 2013, 11:08 pm

Are Science Classrooms with no fume hood exempt?

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Rebecca Grant  on 

We have science classrooms in a new middle school. The science classrooms do not have fume hoods because no hazardous chemicals are used in these classrooms.

1
Tue Nov 5, 2013, 1:35 am

Floodplain Documentation

ND-v2009 SLLp5:Floodplain avoidance
posted by  Bernard Sagaiyaraj  on 

My project has failed the Stage 1 SLLp5 documentation.The project is in Malaysia and the state water department has no records to substantiate that the site has not been flooded before.

1
Wed Mar 13, 2013, 3:18 pm

Embedded marine plywood

CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Carmelito Tatlonghari  on 

The marine plywood we will install will be embedded inside stainless steel, veneer or it will be basically covered with Formica. Can we earn a point under this credit?

1
Wed Mar 13, 2013, 1:34 pm

EAc2 criteria of the biogas

NC-2009 EAc2:On-Site Renewable Energy
posted by  Marcello Polverino  on 

Hello, I need the criteria of biogas outside of United States (Germany). Are ther requirements? Thank you > Marcello

1
Wed Mar 13, 2013, 1:36 pm

One-Time Potable Water Analysis

Pilot-Credits WEpc17:Cooling tower water use
posted by  Edward Malesevich  on 

When the credit requirements ask for a "one-time" potable water analysis to be conducted, what sort of time-frame is required for this to be completed?

1
Wed Mar 13, 2013, 2:28 pm

Deal with leasing agreement?

CS-2009 EAp3:Fundamental Refrigerant Management
posted by  Jorng-ren Chern  on 

I am working on a residential project and tenant units would be sold without interior. We submitted design review and the review commented requested to provide sales agreement.

1
Thu Mar 21, 2013, 8:48 pm

DBA for HVAC Background Noise

Schools-2009 IEQc9:Enhanced Acoustical Performance
posted by  Greengrade User  on 

Is the 40 dba a direct value for the equipment itself, or is it a net value based on a sound path analysis to the space?

1
Wed Mar 13, 2013, 4:16 pm

CAV - How to meet section 3.1 requirement

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Srimannarayana NCVK  on 

Hi, For one of my LEED CI project, air distribution is a CAV system. There is a VFD for AHU though. To document EA c 1.3, i need to meet CPG requirement.

1
Thu Mar 21, 2013, 5:39 pm